My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Eisman & Russo, Inc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(20-07-01) Continuing Professional Consulting Services (CCNA)
>
Responses
>
Eisman & Russo, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2020 3:09:57 PM
Creation date
8/24/2020 3:09:07 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
82
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
screens <br />… Command ===> … <br />… … <br />… … <br />… PROJECT DOCUMENTATION: … <br />… 1. Kept Monthly and Final estimates up to date as the project … <br />… progressed. 5 … <br />… 2. Tracked and monitored RFI's, shop drawings, contract changes, … <br />… and other action items to achieve timely resolution. 4 … <br />… 3. Prepared and organized thorough and complete project … <br />… documentation including a clear filing system, Daily diaries, … <br />… claims documentation, Compliance monitoring and documentation, … <br />… weather letters, and other project records. 5 … <br />… 4. Input information and documentation into Site Manager, EDMS, … <br />… and CQR/LIMS in a timely manner. 5 … <br />… (DOCUMENTS GRADE: 0.62 … <br />… … <br />… … <br />… EFFECTIVE ADMINISTRATION OF THE CONSTRUCTION CONTRACT: … <br />Ä¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢Ô <br />Å Function keys:¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢Õ <br />… PF1-Help PF3-End PF5-RFind PF6-Bottom PF7-Page Up … <br />… PF8-Page Down PF9-Top PF10-Left PF11-Right PF12-Cmd Line … <br />Ä¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢Ô <br />ÅFSLIST: CN412JL.SASOP¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢Õ <br />… Command ===> … <br />… … <br />… 1. Administered the contract according to plans, specifications … <br />… and Contract provisions. Provided clear and timely interpretation … <br />… of contract documents to Contractor. 5 … <br />… 2. Reviewed, approved, and monitored the Contractor's QC plan. … <br />… Took action when necessary. Verified that materials used by the … <br />… Contractor substantially conformed to plans, specifications and … <br />… contract provisions. 5 … <br />… 3. Provided daily inspection and testing services as required by … <br />… the contract and shared results with the Contractor. Reviewed … <br />… Contractor's QC results, compared to VT results and took … <br />… appropriate actions. 4 … <br />… 4. The estimate (Monthly or Final) is true and correct as … <br />… determined by the Consultant's reasonable and independent … <br />… investigation and measurements. 4 … <br />… 5. Effectively and accurately administered the CPPR to hold the … <br />… Contractor accountable for performance. Explained criteria at the … <br />Ä¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢Ô <br />Å Function keys:¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢Õ <br />… PF1-Help PF3-End PF5-RFind PF6-Bottom PF7-Page Up … <br />… PF8-Page Down PF9-Top PF10-Left PF11-Right PF12-Cmd Line … <br />Ä¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢Ô <br />ÅFSLIST: CN412JL.SASOP¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢Õ <br />… Command ===> … <br />… … <br />… pre-construction conference, discussed at the progress meetings … <br />… and maintained accurate records. Utilized the CPPR process … <br />… effectively to encourage Contractor to take full responsibility … <br />… for quality at all levels and to properly document those items … <br />… if they did not. 4 … <br />… CONSTRUCTION CONTRACT ADMINISTRATION: 1.06 … <br />… … <br />… … <br />… PERMIT MONITORING: … <br />… 1. Monitored, verified, and documented that all permit conditions … <br />… were met. 4 … <br />Page 3
The URL can be used to link to this page
Your browser does not support the video tag.