Laserfiche WebLink
156 | IA INTERIOR ARCHITECTS <br />TWR ENGINEERING <br />RELEVANT PROJECT EXPERIENCE <br /> <br /> <br />WESTIN BEACH RESORT HOTEL <br />Ft. Lauderdale, Florida <br /> <br /> <br /> Project completion date 2010 <br /> Estimated Project Cost: $70,000,000 <br /> Architect – Mathes Brierre Architects <br /> Owner – Starwood Capital Group <br /> Point of Contact: Byron Hayes <br /> (407) 399-4481 <br /> Bhayes@pbhassociates.com <br /> <br />Hotel Modernization and Expansion: <br /> <br /> 15 Story South Tower <br />- 180,000 SF Renovation / Expansion <br /> 14 Story North Tower Hotel <br />- 360,000 SF Renovation / Expansion <br /> Total 433 Hotel Rooms and Suites <br /> 50,000 SF new Banquet Facility Building <br /> 2,225 SF Starbucks  <br /> Meeting Rooms <br /> Restaurant & Banquet Kitchen <br /> Fitness Center <br /> Spa <br /> Pool <br /> Bar <br /> <br />Key Personnel for Project: <br /> Bui Wei, P.E., LEED® AP BD+C, CxA, - Senior Mechanical Engineer <br />Eduardo Ramos, P.E., LEED® AP - Senior Plumbing and Fire Protection Engineer <br />Gregory M. Jensen, P.E., LEED® AP - Senior Electrical and Fire Alarm Engineer <br /> <br />Project Scope: <br /> Site inspection to survey the as-built conditions of the building and produce a set of <br />drawings that provide the design team with a clear picture of the existing Electrical, HVAC, <br />plumbing, fire alarm and fire sprinkler systems. <br /> Designed Mechanical, Electrical, Plumbing, Fire Alarm & Fire Protection Construction <br />Documents and provided calculations for the upgrading of the Mechanical, Ventilation and <br />Air Conditioning, Plumbing, Sanitary, Water, Fire Sprinkler, Electrical Power, Lighting, <br />Circuiting for landscape lighting, Fire Alarm, Security, Telephone and Television systems. <br /> Building specifications for commissioning. <br /> Periodic installation inspections. <br /> Test and Balance Report Review. <br /> Thorough inspection of as-built conditions and provided as-built drawings of the system <br />installation. <br /> Upon completion of the as-built drawings a final installation inspection was performed <br /> Reviewed and approved of the Operating and Maintenance Manual.