My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ITB 20-08-01 City Landscaping Services (With Hyperlink to Option B)
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(20-08-01) City Landscaping Services (With Hyperlink to Option B)
>
ITB 20-08-01 City Landscaping Services (With Hyperlink to Option B)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/27/2020 3:59:37 PM
Creation date
8/27/2020 3:58:10 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
157
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
<br /> <br /> <br />City of Sunny Isles Beach | ITB 20-08-01 City Landscaping Services 34 <br /> <br /> The Contractor is responsible for providing all water and power required for the performance of <br />the Work, including the use of a generator, fuel, etc. The use of a generator may be subject to <br />the prior approval of the Project Manager(s) and may be withheld when the Work is in a primarily <br />residential neighborhood. Electrical power required during construction must be installed by a <br />qualified electrical contractor approved by the Project Manager(s). <br /> <br /> Contractor will be responsible to provide all of its employee’s sufficient access to drinking water at <br />the Site(s). <br /> <br /> The City may at its sole discretion provide access to City utilities or water should such be available <br />at the Work site. However, the Contractor is responsible to ascertain the location and accessibility <br />of any utilities and potable water sources necessary to perform the Work. The ability of the City <br />to make utilities available to the Contractor must not form any basis for a change order or claim <br />by the Contractor. <br /> <br />2.33 COORDINATION OF THE WORK <br /> <br />Prior to the commencement of the Work under the Contract, the Project Manager(s) will make <br />every effort, based on available information, to notify the Contractor of any ongoing or scheduled <br />project(s) that will be ongoing or commence during the Work on a Project that may require <br />coordination. The Contractor will be solely responsible for coordinating the Work with any other <br />project(s) to minimize any potential adverse impact. Contractor will not be entitled to any days of <br />delay for failure to properly coordinate the Work. The Project Manager(s) may assist the Contractor <br />in coordinating the Work. However, any such assistance, or lack thereof will not form the basis for <br />any claim for delay or increased cost. <br /> <br />If any part of Contractor’s Work depends upon proper execution or results from the work of any <br />other persons, Contractor must inspect and promptly report to Project Manager(s) any defects in <br />such work that render it unsuitable for such execution and results. Contractor’s failure to so inspect <br />and report will constitute an acceptance of the other person’s work as fit and proper for the <br />reception of Contractor’s Work, except as to defects which may develop in other contractor’s work <br />after the execution of contractor’s Work. Contractor must conduct its operations and take all <br />reasonable steps to coordinate the prosecution of the Work so as to create no interference or <br />impact on any other contractor on the site. Should such interference or impact occur, Contractor <br />will be liable to the affected contractor for the cost of such interference or impact. <br /> <br />2.34 ACCESS TO THE PROJECT SITE(S) <br /> <br />City will provide the lands upon which the Work is to be performed, rights-of-way and easements <br />for access thereto and such other lands as are designated by City for use of Contractor. <br /> <br />2.35 CLEAN-UP <br /> <br />Contractor must, at all times, keep the work site(s) free from accumulation of excess materials, <br />waste materials or rubbish caused by its operations. At the completion of Work at a work site(s), <br />Contractor must remove all tree and landscape cuttings, excess leaves, waste materials and rubbish
The URL can be used to link to this page
Your browser does not support the video tag.