Laserfiche WebLink
<br /> <br /> <br />City of Sunny Isles Beach | ITB 20-08-01 City Landscaping Services 45 <br /> <br /> A two-way communication system between all of the Contractors service vehicles, their <br />main office, and City personnel <br /> <br />The Contractor must own or have leased the equipment at the time of bid submittal. The <br />City may require proof of such ownership or lease agreement at its sole discretion. <br /> <br />3.4.2 EQUIPMENT SPECIAL CONDITIONS <br /> <br />MOWERS All mowers must be rotary mowers with a maximum of a 72” cut. They <br />shall be adjusted to 2 1/2” or 3” cutting height as directed by City, shall <br />be in good repair, shall have no oil or gas leaks, and shall be equipped <br />with grass catchers and sharp blades. Mower blades shall be sharpened <br />or new prior to each cut. All rotary mowers must be mulching-type <br />mowers with no discharge allowed, or all clippings must be manually <br />removed. All equipment must be maintained in sound working condition <br />in order not to exceed comfortable decibel levels or as determined by the <br />City at its sole discretion. Contractor shall clean and sterilize mower <br />between cuttings at each location to prevent the spreading of disease <br />causing pathogens. <br /> <br />EDGER’S Shall be in good repair, shall have no oil or gas leaks, and shall provide a <br />clean straight edge not more than 1/2” away from walks and edge of <br />pavement. <br /> <br />VACUUMS In lieu of blowers, vacuums shall be used as part of this contract on streets <br />and sidewalks so as not to blow debris on or near cars, adjacent <br />properties, gutters, etc. <br /> <br />3.5 FORCE MAJEURE <br /> <br />If weather or other acts of nature prevents the Contractor from conducting the requested services <br />or maintenance on the day specified by the City or otherwise planned by the Contractor, the <br />Contractor shall conduct the services or maintenance requested on the following day at no <br />additional cost to the City (unless otherwise directed by the City). Any change in schedule due <br />to this section must be communicated to the Project Manager prior to the commencement of <br />work. This shall apply throughout this entire ITB. <br /> <br />3.6 IRRIGATION SYSTEM MAINTENANCE <br /> <br />The Contractor must be responsible for the complete management, operation and maintenance <br />of all irrigation systems. Within thirty (30) days of Contract execution, the Contractor must <br />complete an assessment at no additional cost to the City to determine what repairs are required <br />at each Project Site to bring each Irrigation System to full operations. This assessment will <br />provide a detailed breakdown by Project Site of the repair work required and cost of repair. <br />Contractor will be responsible for each Irrigation system once it is fully operational. <br />