Laserfiche WebLink
<br /> <br /> <br />City of Sunny Isles Beach | ITB 20-08-01 City Landscaping Services 62 <br /> <br />so as to leave a neat tree ring appearance. Trees or shrubs damaged as a result of line trimming <br />must be replaced or repaired by the Contractor. If vegetation should die or become unhealthy due <br />to line trimming damage, the Contractor will be responsible for replacing the damaged vegetation <br />with the same species and size at no cost to the City. <br /> <br />Trimming must be done in such a way as to avoid damaging the trunk, bark, or roots of trees and <br />shrubs, fence posts, poles, guardrails and other fixed objects. Contractor shall be responsible for <br />repairing fixed objects including chipped paint due to line trimming. All cuttings must be removed <br />after trimming. <br /> <br />3.17 CATCH BASINS <br />No fuels, oils, solvents, or similar materials are to be disposed of in any catch basins. The Contractor <br />must closely adhere to Federal Environmental Protection Agency requirements, and is responsible for <br />all non-compliance penalties. <br /> <br />3.18 GRAFFITI REMOVAL <br /> <br /> The Contractor shall advise City for authorization/ pre-pre-approval before commencing graffiti <br />removal. The Contractor may provide graffiti removal from all site furnishings, retaining walls, utility <br />boxes and vaults, barrier wall of William Lehman Causeway and Sunny Isles Blvd. Causeway. The <br />Contractor shall assess each surface for the most efficient and effective method of removal with the <br />least impact to the structure and the environment. Methods shall include wipe-off with solvent, <br />commercial self-contained power washing and/or paint-over with closely matched paint with paint <br />sprayer or roller, as directed by the City. The removal of graffiti shall receive high priority and should <br />be addressed within one business day of notice of work to be performed and the work must proceed <br />continuously and expeditiously until the work is complete. The Contractor is responsible for <br />immediately notifying the City of any graffiti found during the regular servicing and inspection of the <br />City. Graffiti removal shall include the barrier walls of the William Lehman Causeway and Sunny Isles <br />Blvd. Causeway. Graffiti removal is on an as needed basis and will be considered a “Supplemental <br />Service.” <br /> <br />3.19 LITTER/DEBRIS REMOVAL <br />Litter removal is performed for aesthetic and safety reasons. It is desired to present a pleasing <br />appearance and environment to the patrons of our parks, beach as well as to motoring and pedestrian <br />traffic within the City, but it is more important to provide safety. Litter in the parks and adjacent <br />swale areas, roadways, cul-de-sacs, landscaped areas and swales is to be removed prior to mowing <br />or edging in order to reduce the possibility of hazards to those using the parks, motorists, pedestrians, <br />and the equipment operators. <br /> <br />The Contractor must perform litter and debris removal in all areas where Work is performed. <br />Responsibilities must include, but not be limited to, the removal and disposal of all natural debris <br />(tree limbs, palm frond, leaves, fallen trees, dry brush, dead animals, etc.) and man-made debris <br />(tires, tire pieces, plastic bags, bottles, lumber, building materials, furniture, shopping carts, <br />household items, vehicle parts, metal junk, packaging materials, campaign/advertising or other signs