My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ITB 20-08-01 City Landscaping Services (With Hyperlink to Option B)
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(20-08-01) City Landscaping Services (With Hyperlink to Option B)
>
ITB 20-08-01 City Landscaping Services (With Hyperlink to Option B)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/27/2020 3:59:37 PM
Creation date
8/27/2020 3:58:10 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
157
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
<br /> <br /> <br />City of Sunny Isles Beach | ITB 20-08-01 City Landscaping Services 64 <br /> <br />negotiated between all parties concerned, but must receive final approval by the City. After the (10) <br />day replacement period, the City may perform the work and withhold monies due to the Contractor <br />for materials and labor costs. <br />Size, Quality and Grade of Replacement <br />a. Replacement material shall be of the same brand, species, quality and grade as that of the <br />material to be replaced, or it shall conform to the Florida Grades & Standards for nursery plants <br />Florida #1 Quality, whichever is higher. The size of the replacement plants shall not be <br />necessarily the same size as the original specified plant at its initial planting. The replacement <br />shall be of equal size to the plant to be replaced at the time it has been determined that it <br />must be replaced. However, if for some reason, the plant to be replaced is smaller than the <br />size to be replaced, the replacement shall be at least equal to the original size when the <br />maintenance period began. <br />b. Plants shall be sound, healthy, and vigorous, free from plant disease, insect pests or their eggs, <br />and shall have normal root systems and comply with all State and local regulations governing <br />these matters, and shall be free from any noxious weeds. <br />c. Any soil supplied by Contractor shall be good, clean, friable top soil (or planting soil mix), free <br />from any toxic, noxious or objectionable materials. including rocks, lime rock, plant parts or <br />seeds. <br />d. All trees shall be measured six (6) inches above ground surface. <br />e. Shape and Form: Plant materials shall be symmetrical, and/or typical for variety and species. <br />f. All plant materials must be provided from a licensed nursery and shall be subject to acceptance <br />as to quality by the Project Manager. <br />g. Replacements shall be guaranteed for (1) year or the length of the Contract, whichever is <br />greater. <br />h. The Contractor shall be responsible for hand watering the replacement (if required), for 42 <br />calendar days after planting at no additional charge to the City. <br /> <br /> <br />END OF SECTION
The URL can be used to link to this page
Your browser does not support the video tag.