My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ITB 20-08-01 - Superior Landscaping Bid Package
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(20-08-01) City Landscaping Services (With Hyperlink to Option B)
>
Responses
>
Superior
>
ITB 20-08-01 - Superior Landscaping Bid Package
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/2/2020 11:50:55 AM
Creation date
10/2/2020 11:46:54 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
133
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
k (PA0.K5 & ROWs) Labor <br />(PARKS R RDWsI Emolument <br />ALL <br />Solid Paspalum notatum'Argentine' Bahia Sod <br />Delivered and Installed - pallets <br />10 pallets <br />(400 SF Each) <br />$ 650.00 <br />$ 9,]50.00 <br />jll <br />111 <br />)12 <br />112 <br />ALL <br />Paspalum Vaginalum <br />Delivered and Installed <br />10 pallets <br />(400 SF Each) <br />$ 650.00 <br />$ 3,250.00 <br />f13 <br />113 <br />ALL <br />Palm Beach Cap Rack <br />8 Sq. Ft. <br />$ 75.00 <br />$ 300.00 <br />Ref No. <br />Subtotal Section")" Lines No. l -13 <br />$ 202,030.00 <br />k (PA0.K5 & ROWs) Labor <br />(PARKS R RDWsI Emolument <br />Est. quantity HOURS/ <br />UNIT PRICE <br />Ref No. <br />Loc DESCRIPTION <br />Per Week Price <br />Annual Excended Total <br />Bid Spec <br />Bid Spec <br />DAYS <br />Est. Quantity HOURS <br />(For One <br />(For One <br />Price Form No <br />Ref No. <br />Price Form No <br />Ref No. <br />Loc <br />DESCRIPTION <br />Item) <br />Item) <br />Annual Extended <br />Total <br />Annual Extended <br />Total <br />One Front End Loader with Backhoe, including an <br />200 Hours <br />11 <br />L3 <br />All <br />Operator (Hourly Rate) <br />10 Hours <br />$ <br />0ne Landscape Superintendent(Sam- <br />(Ram - <br />$ <br />11800.00 <br />One Front End Loader with Backhoe, including an <br />kl <br />KI <br />All <br />Spm, M F) <br />Spm, M -F) <br />$ <br />12 <br />45.00 <br />All <br />$ <br />45,000.00 <br />$ <br />10800.00 <br />One Landscape Superintendent (All other times 100 <br />200 Hours <br />One 15,000 GVW (or larger) Dump Truck with an <br />Hours <br />(All other <br />B <br />All <br />Operator (Hourly Rate) <br />10 Hours <br />$ <br />420.00 <br />k2 <br />K2 <br />All <br />(Sam - Spm, M -F) <br />times) <br />$ <br />One 15,000 GVW (or larger) Dump Truck with an <br />75.00 <br />$ <br />39,000.00 <br />14 <br />14 <br />200 Hours <br />10perator (Daily Rate) <br />10 Days <br />$ <br />20400.00 <br />$ <br />12,000.00 <br />One Landscape Laborer(Bam- <br />(Sam - <br />k3 <br />I K3 <br />All <br />15tem, M -F) <br />Spm, M -F) <br />$ <br />30.00 <br />$ <br />26,000.00 <br />One Self Propelled 24" Deep by 6" Wide <br />200 Hours <br />16 <br />L6 <br />All <br />Trencher with an Operator (Hourly Rate) <br />30 Hours <br />One Landscape Laborer 100 Hours <br />(All other <br />390.00 <br />$ <br />11950.00 <br />B4 <br />K4 <br />All <br />(All other times) <br />limes) <br />$ <br />45.00 <br />17 <br />$ <br />18,000.00 <br />Trencher with an Operator (Daily Rate) <br />10 Days <br />$ <br />11800.00 <br />150 Hours <br />$ <br />9,000.00 <br />Bucket Truck (equipment only) <br />One Irrigation Specialist (Sam - <br />(Sam - <br />19 <br />L8 <br />All <br />(Hourly Rate) <br />40 Hours <br />$ <br />k5 <br />KS <br />All <br />Spm, M -F) <br />Spm, M -F) <br />$ <br />55.00 <br />Chipper Brush (equipment only) <br />$ <br />37,500.00 <br />100 Hours <br />L9 <br />All <br />(Hourly Rate) <br />40 Hours <br />$ <br />45.00 <br />$ <br />900.00 <br />One Irrigation Specialist (All other <br />(All other <br />Stump Grinder (equipment only) <br />k6 <br />K6 <br />All <br />times)times) <br />All <br />$ <br />20 Hours <br />65.00 <br />$ <br />180000.00 <br />$ <br />550.00 <br />150 Hours <br />One Irrigation Laborer(Sam- <br />(Sam - <br />111 <br />k] <br />I K] <br />All <br />5pm, M -F) <br />Spm, M -F) <br />$ <br />195A0 <br />30.00 <br />$ <br />$ <br />2],000.00 <br />Bulldozer (including Operator) <br />00 Hours <br />112 <br />L12 <br />All <br />(Hourly Rate) <br />20 Hours <br />$ <br />One Irrigation laborer (All other <br />(All other <br />$ <br />31500.00 <br />Bulldozer (including Operator) <br />k9 <br />NB <br />All <br />times) <br />times) <br />$ <br />95.00 <br />L13 <br />$ <br />18,500.00 <br />10 Days <br />$ <br />11750.00 <br />Subtotal Section "k" Lines No. 1- 8: <br />$ <br />Is <br />Subtotal Section T' Lines No. l -13 <br />2291000.00 <br />$ <br />Rid Spec Est quantity <br />Est. quantity HOURS/ <br />UNIT PRICE <br />Ref No. <br />Loc DESCRIPTION <br />Per Week Price <br />Annual Excended Total <br />Bid Spec <br />DAYS <br />(For One <br />Price Form No <br />Ref No. <br />Loc <br />DESCRIPTION <br />Item) <br />Annual Extended <br />Total <br />One Front End Loader with Backhoe, including an <br />11 <br />L3 <br />All <br />Operator (Hourly Rate) <br />10 Hours <br />$ <br />360.00 <br />$ <br />11800.00 <br />One Front End Loader with Backhoe, including an <br />12 <br />L2 <br />All <br />Operator (Daily Rate) <br />30 Days <br />$ <br />10800.00 <br />$ <br />91000.00 <br />One 15,000 GVW (or larger) Dump Truck with an <br />13 <br />B <br />All <br />Operator (Hourly Rate) <br />10 Hours <br />$ <br />420.00 <br />$ <br />21100.00 <br />One 15,000 GVW (or larger) Dump Truck with an <br />14 <br />14 <br />All <br />10perator (Daily Rate) <br />10 Days <br />$ <br />20400.00 <br />$ <br />12,000.00 <br />One Trailer Mounted Water Tank (500 gallon <br />IS <br />B <br />All <br />minimum) with Pump and Hose Reel (Daily Rate) <br />10 Days <br />$ <br />5,40D.00 <br />$ <br />27,000.00 <br />One Self Propelled 24" Deep by 6" Wide <br />16 <br />L6 <br />All <br />Trencher with an Operator (Hourly Rate) <br />30 Hours <br />$ <br />390.00 <br />$ <br />11950.00 <br />One Self Propelled 24" Deep by 6" Wide <br />17 <br />L] <br />All <br />Trencher with an Operator (Daily Rate) <br />10 Days <br />$ <br />11800.00 <br />$ <br />9,000.00 <br />Bucket Truck (equipment only) <br />19 <br />L8 <br />All <br />(Hourly Rate) <br />40 Hours <br />$ <br />75.00 <br />$ <br />1,500.00 <br />Chipper Brush (equipment only) <br />19 <br />L9 <br />All <br />(Hourly Rate) <br />40 Hours <br />$ <br />45.00 <br />$ <br />900.00 <br />Stump Grinder (equipment only) <br />110 <br />L30 <br />All <br />(Hourly Rate) <br />20 Hours <br />$ <br />55.00 <br />$ <br />550.00 <br />Grapple Loader <br />(30 cu. yd. capacity, equipment only) <br />111 <br />111 <br />All <br />(Hourly Rate) <br />20 Hours <br />$ <br />195A0 <br />$ <br />1,950.00 <br />Bulldozer (including Operator) <br />112 <br />L12 <br />All <br />(Hourly Rate) <br />20 Hours <br />$ <br />350.00 <br />$ <br />31500.00 <br />Bulldozer (including Operator) <br />113 <br />L13 <br />All <br />(Dally Rate) <br />10 Days <br />$ <br />11750.00 <br />$ <br />8175D.DD <br />Subtotal Section T' Lines No. l -13 <br />$ <br />00,000.00 <br />Price Form No <br />Ref No. <br />Loc DESCRIPTION <br />Per Week Price <br />Annual Excended Total <br />
The URL can be used to link to this page
Your browser does not support the video tag.