My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020 BV Original Bid Forms 2 - Option B
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(20-08-01) City Landscaping Services (With Hyperlink to Option B)
>
Responses
>
2020 BV Original Bid Forms 2 - Option B
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/2/2020 12:07:28 PM
Creation date
10/2/2020 12:04:31 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
59
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
""y OF SUN W' <br />SECTION 5 <br />QUESTIONNAIRE <br />This Completed Form Must be submitted with the Bid. The City may, at its sole discretion, require that the <br />Bidder submit additional information not included in the submitted form. Such information must be <br />submitted with two (2) Calendar Days of the City's request. Failure to submit the form or additional <br />information upon request by the City will result in the rejection of the Bid as Non -Responsive. Additional <br />pages may be used following the same format and numbering. Some information may not be applicable. <br />In such instances insert "N/A". All questions are to be answered in full without exception. <br />Only complete and accurate information shall be provided by the Contractor. The Contractor hereby <br />warrants that, to the best of its knowledge and belief, the responses contained herein are true, accurate, <br />and complete. The Contractor also acknowledges that the City is relying on the truth and accuracy of the <br />responses contained herein. If it is later discovered that any material information given in response to a <br />question was provided by the contractor, knowing it was false, it shall constitute grounds for immediate <br />disqualification, termination, or rescission by the City any subsequent agreement between the City and the <br />Contractor. <br />Employee Information <br />Total No. of Employees for ROW Contract: 6+ <br />Number of Trades Personnel and total number per classification: <br />(Apprentices must be listed separately for each classification) <br />Attached within Format <br />2. Program Manager for this Contract: <br />a. Name: Luke Facarazzo <br />b. Years with Company: 45+ <br />P <br />c. Licenses/Certifications: Attached within Format <br />d. Last 3 projects with the company including role, scope of work, & value of project: <br />City of Aventura Roadways and Parks - Primary contractor - $2+ million <br />City of Sunny Isles Beach I ITB 20-08-01 Right -of -Ways and Facilities Landscape Maintenance Services <br />
The URL can be used to link to this page
Your browser does not support the video tag.