Laserfiche WebLink
Loading and Hauling Debris from Public <br />Property and Rights -of -Way (vegetative or <br />construction debris) to a Temporary Debris <br />Staging and Reduction Site per Cubic Yard <br />within City Limits <br />Per Cubic <br />m15 <br />M15 <br />ALL <br />(Estimated 5,000 cubic yards) <br />Yard <br />$' <br />20.00 <br />Loading and Hauling Debris from Public <br />Property and Rights -of -Way (vegetative or <br />construction debris) to a Final Disposal Site per <br />Cubic Yard within 25 miles of City limits (Estimated <br />Per Cubic <br />m16 <br />M16 <br />ALL <br />5,000 cubic yards) <br />Yard <br />$, <br />20 <br />Loading and Hauling Debris from Public <br />Property and Rights -of -Way (vegetative or <br />construction debris) to a Final Disposal Site per <br />Cubic Yard in excess of 25 miles <br />Per Cubic <br />m17 <br />M17 <br />ALL <br />(Estimated 5,000 cubic yards) <br />Yard <br />$ <br />20.00 <br />$ <br />20 00 <br />Debris Reduction by Chipping/Grinding per <br />per Cubic <br />M18 <br />M18 <br />ALL <br />Cubic Yard <br />Yard <br />Removal of Hazardous Trees and Limbs <br />Work consists of removing and placing them at a <br />City approved location on the City ROW. 6 inch to <br />M19 <br />M19 <br />ALL <br />23.99 inch diameter <br />Each <br />M19 <br />Continued... <br />m19a <br />(A) <br />ALL <br />24 inch to 35.99 inch diameter <br />Each <br />M19 <br />Continued... <br />m19b <br />(B) <br />ALL <br />36 inch and larger diameter <br />Each <br />$ <br />900 00 <br />$ <br />900 00 <br />Removal of Hazardous Stumps Rate includes <br />removal, backfill of stump hole, reduction, and <br />final disposal. Sizes as follows: 24.1 inch to 36.99 <br />;m2 <br />M20 <br />ALL <br />inch diameter <br />Each <br />$ <br />500 00 <br />$, <br />500 00 <br />M20 <br />(A) <br />ALL <br />37 inch to 48.99 inch diameter <br />Each <br />$ <br />60000' <br />