My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2020-3099
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2020
>
Reso 2020-3099
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/7/2022 10:14:26 AM
Creation date
10/5/2020 10:19:09 AM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2020-3099
Date (mm/dd/yyyy)
09/17/2020
Description
Approve Grant Agmt w/FDOT 180 Street Pedestrian Overpass Bridge
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Alt Form 525-010400 STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION 525-011-00 <br />LOCAL AGENCY PROGRAM AGREEMENT PROGRAM MANAGEMENT <br />osizo <br />Page 1 of 3 <br />EXHIBIT O <br />TERMS AND CONDITIONS OF CONSTRUCTION IN DEPARTMENT RIGHT OF WAY <br />1. Construction on the Department's Right of Way. If the Project involves construction on, under, or over the <br />Department's right-of-way, the design work for all portions of the Project to be constructed on, under, or over <br />the Department's right-of-way shall be submitted to the Department for review prior to any work being <br />commenced, and the following provisions shall apply: <br />a. The Project shall be designed and constructed in accordance with the latest edition of the Department's <br />Standard Specifications for Road and Bridge Construction and Department Design Standards and Manual <br />of Uniform Traffic Control Devices ("MUTCD"). The following guidelines shall apply as deemed appropriate <br />by the Department: the Department Structures Design Manual, AASHTO Guide Specifications for the <br />Design of Pedestrian Bridges, AASHTO LRFD Bridge Design Specifications, the Department Plans <br />Preparation Manual ("PPM") and the Department Traffic Engineering Manual. <br />Designs that do not meet Department standards may be rejected by the Department at its sole discretion. <br />The Department may allocate Department -managed resources to facilitate compliance with applicable <br />design standards. If changes to the Department approved plans are required, the Recipient shall notify the <br />Department of the changes and receive approval from the Department prior to the changes being <br />constructed. The Recipient shall maintain the area of the Project, at all times, and coordinate any work <br />needs of the Department during construction of the Project. <br />b. The Recipient shall notify the Department a minimum of 48 hours before beginning construction within, <br />under, or over Department right-of-way. The Recipient shall notify the Department should construction be <br />suspended for more than 5 working days. The Department contact person for construction is <br />Maria E. Kunhardt, District Construction Services Manager, FDOT District Six, 1000 NW 111th Avenue, <br />Miami, FL 33172. Office: 305.640.7405. Email: maria.kunhardt@dot.state.fl.us. <br />c. The Recipient shall be responsible for monitoring construction operations and the maintenance of traffic <br />("MOT") throughout the course of the Project in accordance with the latest edition of the Department <br />Standard Specifications, section 102. The Recipient is responsible for the development of a MOT plan and <br />making any changes to that plan as necessary. The MOT plan shall be in accordance with the latest version <br />of the Department Design Standards, Index 600 series. Any MOT plan developed by the Recipient that <br />deviates from the Department Design Standards must be signed and sealed by a professional engineer. <br />MOT plans will require approval by the Department prior to implementation. <br />d. The Recipient shall be responsible for locating all existing utilities, both aerial and underground, and for <br />ensuring that all utility locations be accurately documented on the construction plans. All utility conflicts <br />shall be fully resolved directly with the applicable utility. <br />e. The Recipient will be responsible for obtaining all permits that may be required by other agencies or local <br />governmental entities. <br />f. It is hereby agreed by the Parties that this Agreement creates a permissive use only and all improvements <br />located on, under, or over the Department's right-of-way resulting from this Agreement shall become the <br />property of the Department. Neither the granting of the permission to use the Department right-of-way nor <br />the placing of facilities upon the Department property shall operate to create or vest any property right to or <br />in the Recipient, except as may otherwise be provided in separate agreements. The Recipient shall not <br />acquire any right, title, interest or estate in Department right-of-way, of any nature or kind whatsoever, by <br />virtue of the execution, operation, effect, or performance of this Agreement including, but not limited to, the <br />Recipient's use, occupancy or possession of Department right-of-way. The Parties agree that this <br />Agreement does not, and shall not be construed to, grant credit for any future transportation concurrency <br />requirements pursuant to Chapter 163, Florida Statutes. <br />
The URL can be used to link to this page
Your browser does not support the video tag.