My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Golden Shores Utility Underground Specs
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(20-09-01) Golden Shores Street Lighting
>
Golden Shores Utility Underground Specs
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/28/2020 9:39:02 AM
Creation date
10/28/2020 9:38:23 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
99
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />CTA Project No. 19-0035-001-01 01040-1 Golden Shores Street Lighting <br />October 12, 2020 SIB Bid No. 20-09-01 <br />SECTION 01040 - COORDINATION <br /> <br /> <br />PART 1 - GENERAL <br />1.01 THE REQUIREMENT <br />A. The Contractor shall allow the CITY or his agents, and other project Contractors or their <br />agents, to enter upon the work for the purpose of constructing, operating, maintaining, <br />removing, repairing, altering, or replacing such pipes, sewers, conduits, manholes, <br />wires, poles, or other structures and appliances which may be required to be installed at <br />or in the work. The CONTRACTOR shall cooperate with all af oresaid parties and shall <br />allow reasonable provisions for the prosecutio n of any other work by the CITY, or others, <br />to be done in connection with his work, or in connection with normal use of the facilities. <br />B. The CONTRACTOR shall cooperate fully with the CITY, the ENGINEER, and all other <br />Contractors employed on the work, to effect proper coordination and progress to <br />complete the project on schedule and in proper sequence. Insofar as possible, decisions <br />of all kinds required from the ENGINEER shall be anticipated by the CONTRACTOR to <br />provide ample time for inspection, or the preparation of instructions. <br />C. The CONTRACTOR shall assume full responsibility for the correlation of all parts of his <br />work with that of other Contractors. Each CONTRACTOR'S superintendent shall <br />correlate all work with other Contractors in the laying out of work. The CONTRACTOR <br />shall lay out his own work in accordance with the Drawings, Specifications, and <br />instructions of latest issue and with due regard to the work of other Contractors . <br />1.02 COORDINATION OF DRAWINGS AND SPECIFICATIONS <br />A. Before starting any Work, CONTRACTOR shall review all Drawings and Specifications and <br />immediately report to the ENGINEER, in writing, any errors, discrepancies, and/or <br />omissions discovered. <br />B. Where differences are discovered between Drawings and Specifications or within either <br />document itself, CONTRACTOR shall notify ENGINEER and request interpretation or <br />decision before proceeding with the Work. ENGINEER, on behalf of CITY, will have final <br />decision regarding such item and manner in which the Work is to be installed and such <br />decision will be final. Otherwise, CONTRACTOR shall include the item or arrangement of <br />better quality, greater quantity, or higher cost in Bid Price. <br />C. CONTRACTOR shall compare Drawings and verify dimensions, clearances and the like <br />before laying out Work and will be held responsible for conflicts that might have been <br />avoided by such verification. <br />D. Drawings are diagrammatic and indicate general arrangement of systems and work <br />included in the Contract. CONTRACTOR shall notify ENGINEER of discrepancies <br />before proceeding. <br />1.03 COORDINATION OF UTILITY ADJUSTMENTS/INSTALLATIONS <br />A. The CONTRACTOR shall be responsible for fully coordinating with utility companies/ <br />agencies any work required in relation to the removal, relocation or other adjustment of <br />utility services existing in the area of construction. Existing utilities and appurtenances <br />shown on the Drawings were located from existing records but no guaranty is made that all <br />existing facilities are shown or that those shown are entirely accurate. The Contractor <br />shall be responsible for determining the exact location of all under ground utilities with the
The URL can be used to link to this page
Your browser does not support the video tag.