My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Attachment B SIB Pedestrian Park Bridge Feasibility Study v1f w Appendix.._ (003)
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(20-10-01) Professional Engineering and Architectural Services for Ped.
>
Attachment B SIB Pedestrian Park Bridge Feasibility Study v1f w Appendix.._ (003)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/6/2020 4:05:52 PM
Creation date
11/6/2020 4:02:58 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
87
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Print Date: <br />5/22/2018 1:53 PM <br />Print Time: <br />TOD Schedule Report <br />for 3881: Collins Av&174 St <br />IntersectionAsset <br />PH 1 PH 8PH 7PH 6PH 5PH 4PH 2 PH 3 <br /> 0 0 0 0 0 0 0 0 <br />NBL SBT ---NBT -EBT <br />Splits <br /> 3881 Collins Av&174 St DOW-3 N/A 0 0 0 Max 0N/A <br />Active <br />Maximum <br />Active <br />PhaseBank <br />TOD <br />SettingOffsetCyclePlan #Op Mode <br />TOD <br />Schedule <br />RedYellowMax 2Max LimitMin InitialDon't WalkWalkPhase <br />Phase Bank <br /> 1 2 3 1 2 3 1 2 3 1 2 3 1 2 3 1 2 3 <br />Veh Ext <br />1 0 0 5 4 205----0--500 24 18--211010--10333-- <br />2 7 20 7 4 2207----20--777 0 0--04040--40111-- <br />3 0 0 0 0 000----0--000 0 0--000--0000-- <br />4 0 0 0 0 000----0--000 0 0--000--0000-- <br />5 0 0 0 0 000----0--000 0 0--000--0000-- <br />6 0 0 7 4 207----0--700 0 0--04040--40111-- <br />7 0 0 0 0 000----0--000 0 0--000--0000-- <br />8 7 24 7 4 2247----24--777 31 31--312525--252.5 2.5 2.5-- <br />unknownLast In Service Date: <br />Permitted Phases <br />12345678 <br />12---6-8Default <br />External Permit 0 <br />External Permit 1 <br />External Permit 2 <br />-------- <br />-2---6-8 <br />-2---6-8 <br />Phase Bank 1Active Phase Bank: <br />NBL <br />SBT <br />- <br />- <br />- <br />NBT <br />- <br />EBT <br />Page 1 of 2 <br />APPENDIX B - SIGNAL TIMINGS <br />B - 2
The URL can be used to link to this page
Your browser does not support the video tag.