Laserfiche WebLink
<br />City of Sunny Isles Beach |Request for Qualifications No. 20-10-01 19 <br /> <br />and/or federally funded projects and describe experience complying with Federal Highway <br />Administration (FHWA) and FDOT LAP requirements. Respondent must have successfully <br />completed the design and permitting of at least one (1) pedestrian bridge project in the past ten <br />(10) years. Consultants responding to this RFQ, must be pre-qualified with FDOT for all <br />professional consulting services required for this project, prior to responding to this <br />RFQ or no later than at such time as an agreement is signed by both parties at their <br />sole cost and expense. <br /> <br />Firm shall be pre-qualified with FDOT in the following classes of work by the time the agreement <br />is fully executed: <br /> <br />• Work Group 3. Highway Design Roadway <br />• Work Group 4. Highway Design – Bridges <br />• Work Group 5. Bridge Inspection <br />• Work Group 6. Traffic Engineering & Operations Studies <br />• Work Group 7. Traffic Operations Design <br />• Work Group 8. Surveying & Mapping <br />• Work Group 9. Soil Exploration, Material Testing and Foundations <br />• Work Group 14. Architect <br />• Work Group 15. Landscape Architect <br /> <br />The selected Consultant understands and acknowledges that the Scope of Services outlined in this <br />Solicitation does not include in its entirety every detail and work required to be performed by the <br />Consultant to successfully complete this Project. The City and the selected Consultant shall <br />negotiate and agree on the basic services, deliverables, timelines and compensation for completion <br />of the Work or any phase included therein. <br /> <br />3.3 CITY ENGINEER <br />All communications and correspondence shall be directed to the City Engineer/ City Project <br />Manager upon award. <br />3.4 DESIGNATED PERSONNEL <br />The Applicant Firm shall designate the personnel according to the organization chart submitted <br />along with proposal, indicating who will be assigned specifically to the performance of this work. <br />At the time of negotiation for entry into a formal contract, the City shall have the right to specify <br />those key project personnel for whom the successful firm assigns to the project. Firm shall not be <br />allowed to substitute other personnel without prior written permission of the City Manager. <br />END OF SECTION <br /> <br />