My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
RFQ 20-10-01 Professional Engineering and Architectural Services for Ped.._
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(20-10-01) Professional Engineering and Architectural Services for Ped.
>
RFQ 20-10-01 Professional Engineering and Architectural Services for Ped.._
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/6/2020 4:33:35 PM
Creation date
11/6/2020 4:33:00 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
57
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
<br />City of Sunny Isles Beach |Request for Qualifications No. 20-10-01 9 <br /> <br />Section 2 <br />Special Terms and Conditions <br /> <br />2.1 PURPOSE OF REQUEST FOR QUALIFICATIONS: <br /> <br />This RFQ is a re-advertisement of RFQ 19-11-01, which was rejected due to the significant <br />procurement review delay due to the pandemic. The City of Sunny Isles Beach (the “City”) is <br />seeking a licensed professional engineering and architectural consultant firm (the “Firm” or <br />“Consultant”) experienced in the engineering and design of a pedestrian bridge. The intended <br />174th St. and Collins Avenue Bridge Park is based on an innovative conceptual design prepared <br />under the Sunny Isles Beach 174th Street Pedestrian Overpass Planning Study and the 2016 <br />Transportation Master Plan. The concept design merged the studies’ results in an efficient, safe, <br />and attractive manner. Collins Ave (A1A) and 174th Street intersection, is one of the most heavily <br />travelled intersections by pedestrians and vehicles within the City. This concept design recommends <br />an open and elevated bridge park, spanning east and west, over the south side of the intersection <br />to accommodate for vehicular improvements at the surface level and to bring the pedestrian to an <br />elevated plane for an enhanced crossing experience reflected as an extension of the Samson <br />Beachfront Park. <br />Engineering and Architectural services for this RFQ include but are not limited to architectural, <br />structural, traffic, civil, landscaping and irrigation, geotechnical, surveying, mechanical (including <br />oversized elevators), electrical and lighting, plumbing, and environmental. <br />The 2016 Transportation Master Plan can be found at <br />https://www.sibfl.net/transportationmasterplan/ <br />The Sunny Isles Beach 174th Street Pedestrian Overpass Planning Study can be found at <br />https://csib-my.sharepoint.com/:b:/g/personal/bigateway_sibfl_net/EVg1Fb- <br />Yn29GkJmRW8DQjI0BG6u2drEKSAbWpEo8-osYxQ?e=sO712x <br />2.2 TERM OF CONTRACT <br /> <br />This contract will commence upon execution by both parties which shall be the effective date <br />succeeding approval of the contract by the City Commission, or City Manager, unless otherwise <br />stipulated in the Notice of Award letter. Prior to initiating the performance of any services under <br />this Agreement, Consultant must receive a written Notice to Proceed from the City Manager prior <br />to beginning the performance of services. The contract shall be contingent upon the completion <br />and submittal of all required documents. However, in the event funding is not appropriated on an <br />annual basis during any particular year within the contract period, the contract may be canceled <br />upon thirty (30) days written notice to Firm. In such an event, the City shall only be responsible <br />for the reasonable value of services performed prior to the effective date of termination. <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.