My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GOLDEN SHORES STREET LIGHTING BID NO 20-09-01
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(20-09-01) Golden Shores Street Lighting
>
Responses
>
AUM
>
GOLDEN SHORES STREET LIGHTING BID NO 20-09-01
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/17/2020 4:43:18 PM
Creation date
11/17/2020 4:41:35 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
77
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Manage all monthly progress payments by quantifying and estimating each line item for all work <br />performed on the project. <br />Manage quality control verification of materials such as concrete, steel, earthwork etc. <br />Verify all materials are in compliance with Specifications and design standards. <br />Manage all design submittals, review and track shop drawtigs, RFI's, RFM's and RFC's. <br />Review, stamp and approve sign and sealed plan sets to be released for construction <br />° Prepared take -offs and estimates for major plan changes. <br />Negotiate costs and constriction means and methods for change orders. <br />Tracking project time. <br />Review of contractor's monthly CPM Schedules <br />Work closely FDOT representative updating them with project status reports. <br />Track project traffic mobility off of traffic detection systems installed throughout the project. <br />Flagler Grouping Projects $45,000,000 -Contract Support Specialist/Project Administrator <br />February 2016 to April 2017. <br />Part of the CEI Team representing the Florida Department of Transportation. <br />° Manage all monthly progress payments by quantifying and estimating each line item for all work <br />performed on the project. <br />Manage quality control verification of materials such as concrete, steel, earthwork etc. <br />Verify all materials are in compliance with Specifications and design standards. <br />Manage all design submittals, review and track shop drawings, RF I's, RFM's and RFC's. <br />Prepared take -offs and estimates for major plan changes. <br />° Negotiate costs and construction means and methods for change orders. <br />Tracking project time. <br />° Work closely FDOT representative updating them with project status reports. Track project traffic <br />mobility off of traffic detection systems installed throughout the project. <br />° Coordinating and managing all Pre -construction Utility operations to ensure all utility work is completed <br />prior to project commencement <br />Coordinating contractor operations with Utility companies <br />Reviewing all lane closures and maintenance of traffic operations minimizing impacts on existing <br />business and residences <br />SR 826/1-75 (Managed Lanes (C)esign-E) <br />uildJ - $47,000,000 - Contract support Specialist <br />March 2014 to February 2016. <br />Part of the CEI Team representing the Florida Department of Transportation. <br />° Assisted in managing all monthly progress payments by quantifying and estimating each line item for all <br />work performed on the project. <br />Manage quality control verification of materials such as concrete, steel, earthwork etc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.