My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GOLDEN SHORES STREET LIGHTING BID NO 20-09-01
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(20-09-01) Golden Shores Street Lighting
>
Responses
>
AUM
>
GOLDEN SHORES STREET LIGHTING BID NO 20-09-01
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/17/2020 4:43:18 PM
Creation date
11/17/2020 4:41:35 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
77
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Rufo Morales <br />Mobile: (786) 355-9815 <br />E-mail: Ruf62000(n.aol.com Text: 7863559815(2mymetropcs.com <br />QUALIFICATIONS <br />✓ 37 years' experience in the elech7cal field. <br />✓ Master electrician license since 1996 <br />✓ HILTI Firestop Systems certification <br />✓ Completed Click Safety Competent Person, Fall Protection training course 2017 <br />✓ Able to read, write and communicate proficiently in English and Spanish <br />✓ A+ certification <br />✓ Network+ certification <br />MCTS: Windows 7, Configuration certification <br />MCTS: Windows Server 2008 Network Infrastructure, Configuration certification <br />MCP: Microsoft Certified Professional <br />✓ MCSA: Windows 7 certification <br />✓ MCITP: Enterprise Desktop Support Technician on Windows 7 certification <br />✓ United States Air Force honorably discharged veteran <br />WORK HISTORY <br />AUM Construction, Inc. Hialeah Gardens, Florida September 2018 -present <br />Project Manager/ Quality Control <br />Overseeing directional boring division of company. <br />Overseeing quality control of electrical installations. <br />Hypower, Inc. Fort Lauderdale, Florida October 2016 -September 2018 <br />Leadman <br />■ Oversaw the lighting portion of the 120,000 square feet Convention <br />Center at Turnberry Isle in Aventura. <br />■ Worked 4 months continuously; 12 hours daily; at Cable USA a wire <br />production plant in Naples, Florida after hurricane Irma moving <br />equipment from a collapsed bay to a functioning bay. <br />■ Installed temporary power to machines to put production lines into <br />use and then permanent power while machines continued to produce <br />wire. <br />■ Tracked daily consumption loads of machines as they went online to <br />balance existing electrical designs. <br />■ Installed single and three-phase motors, transformers and <br />panelboards throughout to accommodate added production lines. <br />Installed control wiring to equipment on production lines and cooling <br />systems used throughout plant. <br />
The URL can be used to link to this page
Your browser does not support the video tag.