My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GOLDEN SHORES STREET LIGHTING BID NO 20-09-01
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(20-09-01) Golden Shores Street Lighting
>
Responses
>
AUM
>
GOLDEN SHORES STREET LIGHTING BID NO 20-09-01
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/17/2020 4:43:18 PM
Creation date
11/17/2020 4:41:35 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
77
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1\ational Construction Workforce Indianapolis, Indiana February 2014 -July 2014 <br />Project Supervisor <br />® Led team of 2 foremen and 40 electricians in the construction of <br />Icon Bay; a 43- story luxury waterfront condominium off of Biscayne <br />Boulevard in Miami. <br />® Tracked daily activities of all personnel for sub -contractor billing. <br />® Coordinated daily with contractor on task allocations and material <br />requisitions. <br />Oversaw daily material and tool distribution and collection. <br />® Project liaison between contractor and sub -contractors and their personnel. <br />Kennedy Electric, Ina Yuiee, Florida November 2013 <br />Joumeyman Electrician <br />® Worked on the temporary power for the job site and office trailers for a Walmart in <br />Boynton Beach that was coming up out of the ground. <br />Erwin Electric, Inc. Tampa, Florida August 2013 <br />Journeyman Electrician <br />Worked on the addition of a sewage pumping and processing station in Immokalee at <br />the Immokalee Water and Sewage Plant. <br />Gulf Electric Company Thonotosassa, Florida May 2013 -July 2013 <br />Journeyman Electrician <br />Worked on the installation of power feeds to equipment and lighting at the Goodwill <br />laundry facility in Miami, a high volume commercial laundry. <br />TASCO Electrical Contractors, Inc. Hialeah, Florida May 2010 -March 2011 <br />Project Supervisor <br />® Supervised the construction of 2 fire stations. Homestead Fire Rescue Station No. 16 <br />and Doral North Fire Rescue Station No. 69. <br />® Coordinated and supervised both jobs simultaneously after the 3 month period <br />between startups. <br />Industrial Electric and Instrumentation, Ina Miami, Florida June 2003 -Nov 2009 <br />Project Supervisor <br />Directed the project at the Melreese Country Club in Miami. The very first city <br />building that was LEED Silver Certified. The project included the installation of an <br />FPL underground feeder over 500 feet long, a parking lot and exterior lighting system <br />that was controlled by an energy management system, a commercial kitchen with <br />banquet facilities that included a fluorescent dimming system, a pro shop, locker <br />rooms and offices. <br />® Oversaw the installation of electrical utility cost reducing surge suppression <br />
The URL can be used to link to this page
Your browser does not support the video tag.