My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
VALUE ENGINEERING
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(20-09-01) Golden Shores Street Lighting
>
Responses
>
AUM
>
VALUE ENGINEERING
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/17/2020 4:45:45 PM
Creation date
11/17/2020 4:45:41 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br /> GOLDEN SHORES STREET LIGHTING <br /> <br /> VALUE ENGINEERING PROPOSAL NO. 2 <br /> <br /> <br /> <br />AUM Construction, Inc. proposes to construct via Directional Bore the Utility Undergrounding of Golden <br />Shores for $60.00/Linear Foot, Furnish & Install. The per linear foot unit cost includes 1 – 4” HDPE <br />Schedule 40 conduit for FPL Utility, 1-2” HDPE Schedule 40 conduit for AT&T, 1-2” HDPE Schedule 40 <br />conduit for Comcast, 1-2” HDPE Schedule 40 conduit for Atlantic Broadband and 2 – 2” HDPE Schedule <br />40 conduits for the City’s street lighting plus 1 -2” HDPE Schedule 40 conduit as a spare for the City’s <br />use. The conduits will be bundled in one main underground trench within the City’s Right-of-Way. <br /> <br />This Value Engineering proposal allows the City to delete the following pay items from the Golden <br />Shores Street Lighting Bid: <br /> <br />- Item 04 – Sawcut & Remove 2’ Strip of Asphalt <br />- Item 06 – Conduit Installed in Existing Pavement <br />- Item 13 – Temporary Asphalt
The URL can be used to link to this page
Your browser does not support the video tag.