Laserfiche WebLink
L. H <br />rF 01 j1�N' <br />11. Discuss what strategies the submitter will utilize to keep this project on schedule. <br />Bases on our experience performinq similar projects. R&D we will be proactive in installing <br />the street lighting system throughout the Golden Shores neighberhood, in the span of the contract <br />duration. Our work will include the installation of light poles, pull boxes, conduits and surface <br />mounted equipment. We will do everything necessary to correct any items that are malfunctioning, <br />performed all the all patch and repair work. <br />12. Discuss strategies the submitter will implement to ensure the project is kept on budget. <br />R&D Electric is confident that it can meet all of the requirements of the Scope of Work that will. <br />guaranteed staying within the budget. R&D Electric has performed this work in the past and has <br />always met or exceeded the requirements of properly installing a proper street lighting system. We <br />will stay on schedule and communicate effectively throughout the protect chain. We will utilize a <br />skilled workforce and maintain on-site safety to avoid any delays. <br />13. Have you personally inspected the plans and location, are there any concerns that may <br />impede your performance on this project? <br />We have inspected the plans and locations and there is no concerns that may impede our <br />performance. <br />14. Describe the submitter's attributes, which make the submitter best -suited for this <br />project. <br />We are the only company in South Florida that is owned and operated by electrical engineers. <br />We cut no corners and the work is done only once simply because it is done the right way. <br />City of Sunny Isles Beach I Invitation to Bid No. 20-09-01 <br />