My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Sagaris Corp.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(20-09-01) Golden Shores Street Lighting
>
Responses
>
Sagaris Corp.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/17/2020 4:51:38 PM
Creation date
11/17/2020 4:49:36 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
68
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Or wo hr - <br />BID FORM <br />Adjusted Bid Total 197489 <br />Golden Shores Street Lighting: Bid Tabulation <br />Prepared For: <br />Cityof Sunny Isles Beach <br />Prepared By: <br />Craven Thompson & Associates <br />Date: <br />9/16}2020 Revised 10/29/20 <br />CTA Project Number: <br />19-0035-001-01 <br />City of Sunny Isles Beach Invitation to Bid Number: <br />20-09-01 <br />Item Description Unit Bid Unit Price Amount <br />Quantity <br />General Conditions <br />01 <br />Mobilization/General Conditions <br />LS <br />1 <br />135000.00 <br />135000.00 <br />02 <br />Maintenance of Traffic (M.O.T.) <br />LS <br />1 <br />50,000.00 <br />50,000.00 <br />Subtotal General <br />Conditions <br />185,000.00 <br />DEMOLITION <br />03 <br />REMOVE EXISTING LIGHT POLE <br />EA <br />32 <br />500.00 <br />16,000.00 <br />04 <br />SAWCUT & REMOVE 2' STRIP OF ASPHALT <br />LF <br />240000 <br />2.00 <br />$48,000.00 <br />Subtotal <br />Demolition <br />64,000.00 <br />PROPOSED <br />05 <br />SERVICE CONNECTION <br />ALLOWANCE <br />4 <br />$20,000.00 <br />$80,000 <br />06 <br />CONDUIT INSTALLED IN EXISTING PAVEMENT <br />LF <br />24,000 <br />3.00 <br />72 000.00 <br />—07— <br />- CONDUIT INSTALLED IN EARTH-- <br />LF - - <br />— —400-- <br />0:00 <br />08 <br />H6 WIRE INSTALLED IN CONDUIT <br />LF <br />72,000 <br />1.5 <br />108000.00 <br />09 <br />#3 WIRE INSTALLED IN EARTH <br />LF <br />11200 <br />5.00 <br />s Ron on <br />10 <br />LIGHT FIXTURE, POLE, PULLBOX COMPLETE <br />EA <br />131 <br />7600.00 <br />995,600.00 <br />11 <br />PRE -CAST FOUNDATION <br />EA <br />131 <br />750.00 <br />98,250.00 <br />12 <br />SPREAD FOUNDATION <br />EA <br />1 <br />21300.00 <br />21300.00 <br />13 <br />TEMPORARY ASPHALT <br />SY <br />51333 <br />30 75 <br />163,989.80 <br />Subtotal Proposed <br />1;534,140.00 <br />14 <br />PROJECT CONTINGENCY(with Owner approval) <br />ALLOWANCE <br />1 <br />$200,000 <br />$200,000 <br />15 <br />BID TOTAL <br />$1,983,140.00 <br />16 <br />Value Engineering (VE) Deduct <br />LS <br />4235,000.00 <br />140.00 <br />Above VE Deduct Pricing Per Alternate Niland Company Light Fixture &Pole <br />City of Sunny Isles Beach � Invitation to Bid No. 20-09-01 <br />
The URL can be used to link to this page
Your browser does not support the video tag.