My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Sagaris Corp.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(20-09-01) Golden Shores Street Lighting
>
Responses
>
Sagaris Corp.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/17/2020 4:51:38 PM
Creation date
11/17/2020 4:49:36 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
68
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ADDENDUM # 1 <br />DATE: Thursday, October 29, 2020 <br />TO: ALL PLANHOLDERS <br />FROM: Purchasing Administrator <br />BID NO.: ITB 20-09-01 Golden Shores Street Lighting Bid <br />SUBJECT: Addendum No.1 <br />BID SUBMITTAL DEADLINE: Tuesday, November 10, 2020 at 2:30 PM <br />Please attach this addendum to the documents in your possession and include the Acknowledgement <br />of Addenda form with your response incorporated with the Invitation to Bid. <br />Revisions: (Note: Deletions will be indicated by 5tFikethF9Wgh additions will be <br />indicated with bold font): <br />Q1. Will the city accept alternatives to the Holophane Esplanade Teardrop if the specs are matched <br />equivalently? <br />Al. Alternatives will be reviewed as part of the Value Engineering separate submittal, within the sealed <br />bid. <br />Q2. Can you please provide the estimated completion time and contract price for the Golden Shores <br />Street Lighting project. <br />A2. Regarding the budget please refer to the meeting minutes below. The project duration will be <br />established as a function of bid analysis and availability of material. <br />Q3. In order to analyze value engineering proposals for the city, please provide the proposed cross <br />section for undergrounding the existing utilities within the project limits detailing the conduits' sizing & <br />cover for each of the utilities. In addition, please also indicate the offset from the centerline or edge of <br />pavement for this proposed undergrounding within the project limits. Also, please indicate the proposed <br />spacing for manholes/pull boxes/etc. For each of the utilities that will be undergrounded. <br />A3. The future undergrounding and consequences of same are immaterial to the street lighting project. <br />Follow the plans as presented for bidding. <br />Q4. Can multiple value engineering proposals be presented? <br />A4. Yes, value engineering is explained more below as part of the attachments, however yes multiple <br />value engineering suggestions are welcomed. <br />Q5. Please indicate the duration of the contract and if liquidated damages are applicable. <br />AS. No Liquidated Damages are anticipated as a part of this contract. The project duration will be <br />established as a function of bid analysis and availability of material. However, time is of the essence and <br />a 100% performance & payment bond is required at the time of award. <br />Q6. The specification shows a non -cut-off luminaire with a teardrop globe. This unit's light distribution <br />and performance combine the light source output with the prismatic globe lens distribution. Most <br />municipalities and communities are reducing glare and light pollution using full cut-off units. Removing <br />
The URL can be used to link to this page
Your browser does not support the video tag.