My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Rohl Global
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(20-09-01) Golden Shores Street Lighting
>
Responses
>
Rohl Global
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/17/2020 4:54:53 PM
Creation date
11/17/2020 4:52:55 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
113
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ROHL GLOBAL NETWORKS <br />Qualifications <br />Rohl Global Networks (RGN) has been operating in the field of utility installation for over <br />twenty-five years and more specifically with Florida Power and Light (FPL), Comcast (CC), <br />Hotwire (HW), Atlantic Broad Band (AB) and ATT for the past five years. Details on the specific <br />projects follow in this section. <br />Needless to say, intimate familiarity with procedures all of the utility service providers depend <br />upon regarding design criteria, installation details, timeliness and coordination of schedules <br />along with material supply are the backbone of a successful project. RGN has received, <br />managed the storage of and installed over two hundred and eighty thousand linear feet of <br />conduit and related hand holes, equipment chambers and pads in the Sunny Isles Beach Florida <br />project alone. <br />Not only is service quality of prime importance to the utility companies, safety of the general <br />public and installation crews demands the highest level of awareness while working around <br />existing utilities. Our crews are led daily by an onsite safety officer whose only responsibility is <br />safeguarding life and limb of the public and our crews along with the security of active utility <br />lines often in close proximity to our activities. Much of our work, especially within the public <br />right of way demands installation to be accomplished during nighttime and early morning hours <br />which only serve to put higher demands on safety precautions. <br />With limited access to numerous conduit routing sites the utilization of directional boring or <br />missiling operations is a significant tool utilized in the installation of conduit for utility runs. <br />RGN has its own directional boring equipment and unless schedule requirements demand <br />otherwise, executes all of the subsurface access with our own crews. Daily reports, boring <br />records, operations and maintenance logs are fundamental requirements of a safe and efficient <br />boring operation all of which we pride ourselves with the past performance record. <br />Specific details for two current projects follow: <br />a.Project 1. -Sunny Isles Beach (SIB) Collins Avenue Utility Undergrounding <br />Collins Avenue, State Road AlA, from Golden Beach on the North to Hallandale Beach on the <br />South -over two miles in length, and is one of the heaviest travelled thoroughfares in South <br />Florida with daily vehicular trips exceeding forty-five thousand in any given twenty-four hour <br />period. <br />1
The URL can be used to link to this page
Your browser does not support the video tag.