My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CCC Bid Submittal _Golden Shore Street Lighting
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(20-09-01) Golden Shores Street Lighting
>
Responses
>
CCC Bid Submittal _Golden Shore Street Lighting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/17/2020 4:56:38 PM
Creation date
11/17/2020 4:55:15 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
65
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Section 3 <br />Scope of Services / Technical Specifications <br />KX __'�L&IM0711ED <br />'try of W I' <br />The Golden Shores neighborhood is located in the City of Sunny Isles Beach. The City is seeking <br />a bid to provide street lighting throughout the neighborhood. The project involves removal of <br />existing light poles, furnish and install new light poles, and related restoration. There is a planned <br />future project (by others) in this neighborhood that will involve conversion of overhead utilities to <br />underground. Contractor shall be responsible for obtaining applicable permits. <br />PART 1 -GENERAL <br />1.1 WORK COVERED BY CONTRACT DOCUMENTS <br />A. This contract comprises of work described in accordance with plans and specifications <br />entitled: Golden Shores Street Lighting, Sunny Isles Beach, Florida, dated September 11, <br />2020, including sheets E-0 through E -36Z-37 and Project Specifications included as Exhibit <br />'A'. The project involves lighting improvements within the Golden Shores neighborhood <br />bounded on the South by 185th Street, the North by 191 Terrace, the East by Atlantic Blvd <br />and the West by North Bay Rd within the City of Sunny Isles Beach. Improvements include <br />furnish and install light poles complete with concrete bases, luminaires, pull boxes, <br />trenched and trenchless installation of conduit, repair and replacement of existing <br />improvements disturbed in providing same, and electrical service connections to a <br />temporary power source for each street. <br />1.2 WORK SEQUENCE <br />A. Construct Work in phases to accommodate Owner's Service requirements during <br />construction period. <br />B. Coordinate construction schedule and operations with Owner and Engineer. <br />1.3 CONTRACTOR USE OF SITES <br />A. Limit use of sites for Work and for construction operations, to allow for: <br />1. Owner servicing areas with municipal services. <br />2. Work by other contractors. <br />3. Public access to adjacent properties. <br />City of Sunny isles Beach I Invitation to Bid No. 20-09-01 <br />
The URL can be used to link to this page
Your browser does not support the video tag.