My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Finley Engineering Group
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(20-10-01) Professional Engineering and Architectural Services for Ped.
>
Responses
>
Finley Engineering Group
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/23/2020 10:40:06 AM
Creation date
11/23/2020 10:38:29 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
168
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RFQ No. 20-10-01 Professional Engineering and Architectural Services for Pedestrian Bridge with Park Elements Across A1A at 174th St. CCNA <br />City of Sunny Isles Beach <br />94| <br />Hanson Professional Services, Inc. <br />Florida Department of Transportation <br />RON DESANTIS <br />GOVERNOR 605 Suwannee Street <br />Tallahassee, FL 32399-0450 <br />KEVIN J. THIBAULT, P.E. <br />SECRETARY <br />Safety, Mobility, Innovation <br />www.fdot.gov <br />June 17, 2020 <br />Jeffery Bowen, Senior Vice President <br />HANSON PROFESSIONAL SERVICES INC. <br />8075 Gate Parkway West, Suite 204 <br />Jacksonville, Florida 32216 <br />Dear Mr.Bowen: <br />The Florida Department of Transportation has reviewed your application for <br />prequalification package and determined that the data submitted is adequate to technically <br />prequalify your firm for the following types of work: <br />Group 2 -Project Development and Environmental (PD&E) Studies <br />Group 3 -Highway Design -Roadway <br />3.1 - Minor Highway Design <br />3.2 - Major Highway Design <br />3.3 - Controlled Access Highway Design <br />Group 4 -Highway Design - Bridges <br />4.1.1 - Miscellaneous Structures <br />4.1.2 - Minor Bridge Design <br />4.2.2 - Major Bridge Design -Steel <br />Group 6 -Traffic Engineering and Operations Studies <br />6.1 - Traffic Engineering Studies <br />6.2 - Traffic Signal Timing <br />Group 7 -Traffic Operations Design <br />7.1 - Signing, Pavement Marking and Channelization <br />7.2 - Lighting <br />7.3 - Signalization <br />Group 8 -Survey and Mapping <br />8.1 - Control Surveying <br />8.2 - Design, Right of Way & Construction Surveying <br />8.4 - Right of Way Mapping <br />EQUALIFICATION INFORMATION & ASSIGNED PERSONNEL
The URL can be used to link to this page
Your browser does not support the video tag.