RFQ No. 20-10-01 Professional Engineering and Architectural Services for Pedestrian Bridge with Park Elements Across A1A at 174th St. CCNA
<br />City of Sunny Isles Beach
<br />|123
<br />REFERENCES:
<br />1) Client: The St Joe Company, Bridget Precise, (850) 231-6480 bridget.precise@joe.com
<br />Project Name: Watersound Footbridge Over US 98 (Watersound, FL)
<br />Description of Services: FINLEY prepared visualizations and concept drawings of the bridge as well as
<br />conceptual cost estimates and construction schedules. The cost estimates were calculated on a unit based
<br />price model. The report concluded with a comparison chart based on criteria that are of importance to a
<br />bridge of this scale and location.
<br />Year Completed: 2019
<br />Relevant Team Members: Jerry Pfuntner, PE, SE, Maxim D. Nasab, AIA, NCARB, Patrick Noble, PE, SE, Craig
<br />Finley, PE.
<br />2) Client: GLF Construction, Joseph M. Beaird, P.E, Vice President / COO, (305) 371-5228, jbeaird@glfusa.com
<br />Project Name: Capital Cascades Crossing Pedestrian Bridge (Tallahassee, FL)
<br />Description of Services: The bridge’s design focuses on aesthetics and presented many challenges for
<br />construction. FINLEY developed a unique temporary support system for the superstructure precast girder
<br />sections that allowed the four slanted steel pipe columns to remain in position while the deck was supported
<br />and post-tensioned. This unique system then allowed for the transfer of the deck to the four slanted columns
<br />acting as the permanent interior piers. For this project, FINLEY provided Construction Engineering services
<br />including, Erection Manual, Falsework Design and Geometry Control.
<br />Year Completed: 2016
<br />Relevant Team Members: Jerry Pfuntner, PE, SE, Craig Finley, PE
<br />3) Client: JV-Community Asphalt Corporation, Condotte America, Inc. and The DeMoya Group, Inc./BCC
<br />Engineering Inc. Andres Mendoza, PE, President, Condotte America, Inc., (305) 986-9404,
<br />amendoza@condotteamerica.com
<br />Project Name: Palmetto Section 5 SR 826/836 Interchange D-B-F (Miami, FL)
<br />Description of Services: FINLEY designed and provided the construction engineering on four high-level
<br />segmental bridge ramps that traverse the core of the interchange. The segmental bridge ramps were precast
<br />balanced cantilevers, and were erected with a 460 ft launching gantry. The bridge lengths vary from 1,100 ft to
<br />2,450 ft in length and are 47-ft-wide. The curved segmental bridge ramps are the third level of the interchange
<br />with radii down to 590 ft and have a maximum superstructure deck height of 95 ft above the proposed
<br />ground. The design offered unique challenges integrating underlying roadways, canals and MOT requirements
<br />into the layout of these segmental bridge ramps.
<br />Year Completed: 2016
<br />Relevant Team Members: Jerry Pfuntner, PE, SE, Craig Finley, PE, Enrique Espeno, PE, Hernando R. Ramos, PE,
<br />Mark R. Sowers, PSM, SUE, Carmine Borea, PE.
<br />FIRM REFERENCES & SIMILAR WORK COMPLETED F
|