My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Hardesty & Hanover, LLC
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(20-10-01) Professional Engineering and Architectural Services for Ped.
>
Responses
>
Hardesty & Hanover, LLC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/23/2020 10:58:06 AM
Creation date
11/23/2020 10:53:21 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
400
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />FDOT Process <br />The 2020 FDOT Florida Design Manual (FDM) <br />included updated stipulations for Review of Non- <br />Department-Owned Projects in new construction <br />(Article 121.18 shown to right). This update <br />establishes the review requirements for non- <br />department-owned projects crossing Department- <br />owned right-of-way. The Bridge Park does not cross <br />an National Highway System facility and will <br />therefore not require FHWA approval. <br />H&H’s proposed Category 1 structural <br />system streamlines the review process <br />since it only requires review from the <br />District Structures Design Office (DSDO) <br />and not the State Design Office (SDO). <br /> <br />Bridge Park Project Process <br />H&H’s Bridge Park Project Process, presented on the following foldout, outlines the project delivery <br />phases from Project Initiation through Post-Design/Construction. <br /> <br />H&H is one of the premier bridge design firms in the state and has been trusted with FDOT’s most complex <br />bridge replacement projects. Below is a listing of FDOT bridge replacement projects in the past decade <br />and their status in the FDOT process: <br />1. SFRC over Miami Canal FDOT D6 Initial Design <br />2. SW 1St Street over Miami River FDOT D6 Post Design - Construction <br />3. NW 5th Street over Miami River FDOT D6 Complete <br />4. HEFT Ramp H4 FDOT D6 Complete <br />5. HEFT Ramp H5 FDOT D6 Complete <br />6. Flagler Memorial over ICWW FDOT D4 Complete <br />7. North Bridge over ICWW FDOT D4 Final Design - Biddability Phase <br />8. Jupiter Federal over ICWW FDOT D4 Final Design - Production Phase <br />9. Pembroke Rd over I-75 FDOT D4 Complete <br />10. Miramar Over I-75 FDOT D4 Complete <br />11. CSX over New River FDOT D4 Complete <br />12. Little Ringling over Sarasota Bay FDOT D1 PD&E <br />13. SR 50 over I-75 FDOT D7 Complete <br />14. I-4 CD over Bypass Canal FDOT D7 Initial Design <br />15. SR 77 over SR 75 FDOT D3 Final Design - Biddability Phase <br />2020 FDOT Florida Design Manual Excerpt
The URL can be used to link to this page
Your browser does not support the video tag.