Laserfiche WebLink
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />(Complete one Section E for each key person) 12. NAME <br />PAOLA RIVEROS, PE <br />13. ROLE IN THIS CONTRACT <br />Signing, Pavement Marking, Signals <br />14. YEARS EXPERIENCE <br />a.TOTAL <br />20 <br /> b. WITH CURRENT FIRM <br />20 <br />15.FIRM NAME AND LOCATION (City and State)R.J. BEHAR & COMPANY, INC. 6861 SW 196th Avenue, Suite 302 <br />Pembroke Pines, FL 33332 <br />16. EDUCATION (Degree and Specialization)B.S. Civil Engineer, Florida International University/2001 17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline) <br /> P.E. Florida No.74249/2012 P.E. Washington, D.C., No. 905769/2010 <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)Ms. Riveros has been responsible for the preparation of roadway plans, Maintenance of Traffic (MOT) plans, drainage plans and site <br />plans throughout South Florida. She is fully knowledgeable of Microstation Open Roads and Civil 3D. She was recipient of the <br />Governor’s Project Team Award for her participation as Project Manager on the I-95 PD&E study from Stirling Rd to Oakland Park Blvd. <br />19. RELEVANT PROJECTS <br />a. <br />(1) TITLE AND LOCATION (City and State)I-95 at 6th Avenue Interchange Final Design, Palm Beach County, Florida – <br />Florida Department of Transportation (FDOT), District 4 <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES Ongoing CONSTRUCTION (If applicable) <br />(3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />Project Manager responsible for the interchange improvements, which includes a Level IV CAP, six typical sections, pavement design, access <br />management, TCP plans, temporary lighting on all ramps, drainage, utility coordination, Environmental Permits, signing and marking plans, <br />signalization and complete management of all subconsultants. The project also includes milling and resurfacing, adding bike lines, upgrading <br />roadway signs and curb ramps to meet the current ADA standards, adding exclusive right turn lanes, and modifications to existing CSX tracks and <br />overhead railroad structure. Project #: 436963-1-32-01; Project Length: Interchange; Cost/Fees Paid: $750,000.00; Construction Cost: $TBD. <br />b. <br />(1) TITLE AND LOCATION (City and State)NE 151st Street Improvements, Miami-Dade County, Florida – Oleta Partners LLC/Miami-Dade County <br /> <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES Ongoing CONSTRUCTION (If applicable) <br />(3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firmProject Engineer: She is responsible for assisting with the roadway design, drainage design, signing and pavement markings, signalization, <br />lighting, Temporary Traffic Control Plan (TCP) design, wetland assessment, and utility coordination. NE 151st Street is an off-system roadway <br />bound by the Florida Greenbook, for its design criteria. Drainage design includes a series of interconnected French drains with drainage wells. <br />Cost/Fees Paid: $498,000.00; Construction Cost: $5,757,000.00; Project Length: 0.876 miles <br />c. <br />(1) TITLE AND LOCATION (City and State)SW 35th Avenue from SW 29th Street to SW 28th Street – City of Miami, Florida (2) YEAR COMPLETED <br />PROFESSIONAL SERVICES 2020 CONSTRUCTION (If applicable) <br />(3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firmProject Manager in charge of civil engineering servicees, milling and resurfacing, pavement marking and signing, ADA ramps, <br />drainage improvements, permitting, utility coordination, cost estimates, and construction administration services. Project Length: <br />0.117 miles; Cost/Fees Paid: $40,908.00; Construction Cost: $216,142.20 (Estimate). <br />d. <br />(1) TITLE AND LOCATION (City and State)SW 136th Street from US-1 to Old Cutler Road Lap Project, Miami-Dade County, <br />Florida – Village of Palmetto Bay/ FDOT, District 6 <br /> <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES 2019 CONSTRUCTION (If applicable) Post Design Services <br />(3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firmProject Engineer: She was responsible for designing the roadway plans, pavement marking and signing plans, utility coordination, <br />drainage design and, permitting. The improvements will require milling and resurfacing the existing roadway and pavement widening <br />to accommodate an on-road dedicated bicycle lane. The primary challenge for this project was accommodating the proposed <br />sidewalks and bicycle lanes in a right of way constrained corridor. Project #: 434687-1 ; Project Length: 1.92; Cost/Fees Paid: <br />$193,171.00; Construction Cost: $1,700,345.00 (Estimated). <br />e. <br />(1) TITLE AND LOCATION (City and State)SR-25/Okeechobee Road from W 7th Avenue to NW 36th Street, Miami-Dade <br />County, Florida – FDOT, District 6 <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES 2019 CONSTRUCTION (If applicable) <br />(3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firmProject Engineer: The scope of work included milling and resurfacing, intersection island modifications and removals, upgrading <br />pedestrian facilities to comply with ADA requirements, guardrail upgrades, signalization improvements, new signing and pavement <br />markings and bridge railing upgrades, TTCP plans, and post design services. The project scope also included the addition of paved <br />shoulders along both sides and culvert relocation at Frontage Road. Project #: 425979-2-32-01; Cost/Fees Paid: $524,942.00; <br />Construction Cost: 1,680,000.00. Project Length: 1.506 miles. <br /> STANDARD FORM 330 (REV. 8/2016) PAGE 2