|
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
<br />(Complete one Section E for each key person) 12. NAME
<br />PAOLA RIVEROS, PE
<br />13. ROLE IN THIS CONTRACT
<br />Signing, Pavement Marking, Signals
<br />14. YEARS EXPERIENCE
<br />a.TOTAL
<br />20
<br /> b. WITH CURRENT FIRM
<br />20
<br />15.FIRM NAME AND LOCATION (City and State)R.J. BEHAR & COMPANY, INC. 6861 SW 196th Avenue, Suite 302
<br />Pembroke Pines, FL 33332
<br />16. EDUCATION (Degree and Specialization)B.S. Civil Engineer, Florida International University/2001 17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline)
<br /> P.E. Florida No.74249/2012 P.E. Washington, D.C., No. 905769/2010
<br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)Ms. Riveros has been responsible for the preparation of roadway plans, Maintenance of Traffic (MOT) plans, drainage plans and site
<br />plans throughout South Florida. She is fully knowledgeable of Microstation Open Roads and Civil 3D. She was recipient of the
<br />Governor’s Project Team Award for her participation as Project Manager on the I-95 PD&E study from Stirling Rd to Oakland Park Blvd.
<br />19. RELEVANT PROJECTS
<br />a.
<br />(1) TITLE AND LOCATION (City and State)I-95 at 6th Avenue Interchange Final Design, Palm Beach County, Florida –
<br />Florida Department of Transportation (FDOT), District 4
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES Ongoing CONSTRUCTION (If applicable)
<br />(3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Project Manager responsible for the interchange improvements, which includes a Level IV CAP, six typical sections, pavement design, access
<br />management, TCP plans, temporary lighting on all ramps, drainage, utility coordination, Environmental Permits, signing and marking plans,
<br />signalization and complete management of all subconsultants. The project also includes milling and resurfacing, adding bike lines, upgrading
<br />roadway signs and curb ramps to meet the current ADA standards, adding exclusive right turn lanes, and modifications to existing CSX tracks and
<br />overhead railroad structure. Project #: 436963-1-32-01; Project Length: Interchange; Cost/Fees Paid: $750,000.00; Construction Cost: $TBD.
<br />b.
<br />(1) TITLE AND LOCATION (City and State)NE 151st Street Improvements, Miami-Dade County, Florida – Oleta Partners LLC/Miami-Dade County
<br />
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES Ongoing CONSTRUCTION (If applicable)
<br />(3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firmProject Engineer: She is responsible for assisting with the roadway design, drainage design, signing and pavement markings, signalization,
<br />lighting, Temporary Traffic Control Plan (TCP) design, wetland assessment, and utility coordination. NE 151st Street is an off-system roadway
<br />bound by the Florida Greenbook, for its design criteria. Drainage design includes a series of interconnected French drains with drainage wells.
<br />Cost/Fees Paid: $498,000.00; Construction Cost: $5,757,000.00; Project Length: 0.876 miles
<br />c.
<br />(1) TITLE AND LOCATION (City and State)SW 35th Avenue from SW 29th Street to SW 28th Street – City of Miami, Florida (2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES 2020 CONSTRUCTION (If applicable)
<br />(3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firmProject Manager in charge of civil engineering servicees, milling and resurfacing, pavement marking and signing, ADA ramps,
<br />drainage improvements, permitting, utility coordination, cost estimates, and construction administration services. Project Length:
<br />0.117 miles; Cost/Fees Paid: $40,908.00; Construction Cost: $216,142.20 (Estimate).
<br />d.
<br />(1) TITLE AND LOCATION (City and State)SW 136th Street from US-1 to Old Cutler Road Lap Project, Miami-Dade County,
<br />Florida – Village of Palmetto Bay/ FDOT, District 6
<br />
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES 2019 CONSTRUCTION (If applicable) Post Design Services
<br />(3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firmProject Engineer: She was responsible for designing the roadway plans, pavement marking and signing plans, utility coordination,
<br />drainage design and, permitting. The improvements will require milling and resurfacing the existing roadway and pavement widening
<br />to accommodate an on-road dedicated bicycle lane. The primary challenge for this project was accommodating the proposed
<br />sidewalks and bicycle lanes in a right of way constrained corridor. Project #: 434687-1 ; Project Length: 1.92; Cost/Fees Paid:
<br />$193,171.00; Construction Cost: $1,700,345.00 (Estimated).
<br />e.
<br />(1) TITLE AND LOCATION (City and State)SR-25/Okeechobee Road from W 7th Avenue to NW 36th Street, Miami-Dade
<br />County, Florida – FDOT, District 6
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES 2019 CONSTRUCTION (If applicable)
<br />(3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firmProject Engineer: The scope of work included milling and resurfacing, intersection island modifications and removals, upgrading
<br />pedestrian facilities to comply with ADA requirements, guardrail upgrades, signalization improvements, new signing and pavement
<br />markings and bridge railing upgrades, TTCP plans, and post design services. The project scope also included the addition of paved
<br />shoulders along both sides and culvert relocation at Frontage Road. Project #: 425979-2-32-01; Cost/Fees Paid: $524,942.00;
<br />Construction Cost: 1,680,000.00. Project Length: 1.506 miles.
<br /> STANDARD FORM 330 (REV. 8/2016) PAGE 2
|