My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
EAC Consulting, Inc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(20-10-01) Professional Engineering and Architectural Services for Ped.
>
Responses
>
EAC Consulting, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/23/2020 11:01:33 AM
Creation date
11/23/2020 10:59:19 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
260
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
F.EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'SQUALIFICATIONS FOR THIS CONTRACT <br />(Present as many projects as requested by the agency, or 10 projects, if not specified. <br />Complete one Section F for each project.) <br />20. EXAMPLE PROJECT KEY <br />NUMBER (4) <br />21.TITLE AND LOCATION (City and State)Downtown Government Center Station (All Aboard Florida)22.YEAR COMPLETED <br />PROFESSIONAL <br />SERVICES <br />CONSTRUCTION (If applicable) <br />23.PROJECT OWNER’S INFORMATION <br />a.PROJECT OWNERCGC/Brightline b.POINT OF CONTACT NAMERobert Cortes c.POINT OF CONTACT TELEPHONE NUMBER305-520-2470 <br />24.BRIEF DESCRIPTION OF PROJECT AND REVELANCE TO THIS CONTRACT (Include scope, size, and cost) <br />EAC provided structural design services for the Miami Central Station Rail Infrastructure and Rail Viaduct, and also provided post-design <br />support. The viaduct is an elevated guideway structure, built 50 feet above ground for AAF and Tri-Rail passenger trains. EAC collaborated <br />with New York City architectural firm Skidmore, Owings, & Merrill (SOM) on the design of one of the viaduct’s most prominent features, the <br />distinctive V-shaped columns which enhance the aesthetics and open layout of the station’s entrance. In order to maintain the station’s high- <br />quality environment, EAC’s design also employs context-sensitive vibration impact mitigation, which would prevent train vibration from <br />spreading into the station area. As an integrated component of the Miami Central Station, the design of the viaduct is an example of the <br />sensitive balance of aesthetic form and function. <br />Total Construction: $1.5 Billion <br />25.FIRMS FROM SECTION INVOLVED WITH THIS PROJECT <br />a. (1)FIRM NAME <br />EAC Consulting, Inc. <br />(2) FIRM LOCATION (City and State) <br />Miami, FL <br />(3) ROLE <br />Prime <br />b. (1)FIRM NAME (2) FIRM LOCATION (City and State)(3) ROLE <br />c. (1)FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE <br />d. (1)FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE <br />e. (1)FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE <br />f. (1)FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE <br />STANDARD FORM 330 - EAC Consulting, Inc. Page 3
The URL can be used to link to this page
Your browser does not support the video tag.