My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
EAC Consulting, Inc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(20-10-01) Professional Engineering and Architectural Services for Ped.
>
Responses
>
EAC Consulting, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/23/2020 11:01:33 AM
Creation date
11/23/2020 10:59:19 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
260
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
F.EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'SQUALIFICATIONS FOR THIS CONTRACT (Present as many projects as <br />requested by the agency, or 10 projects, if not specified. <br />Complete one Section F for each project.) <br />20.EXAMPLE PROJECT KEY NUMBER(7) <br />21.TITLE AND LOCATION (City and State) <br />MetroZoo Aviary -Miami, FL <br />22.YEAR COMPLETED <br />PROFESSIONAL <br />SERVICES N/A <br />CONSTRUCTION (If <br />applicable) 2003 <br />23.PROJECT OWNER’S INFORMATION <br />a.PROJECT OWNERMiami – Dade County parks andRecreation Department <br />b.POINT OF CONTACTNAME Michael Yaskin <br />c.POINT OF CONTACT TELEPHONE NUMBER(305) 755-7816 <br />24.BRIEF DESCRIPTION OF PROJECT AND REVELANCE TO THIS CONTRACT (Include scope, size, and cost) <br />EAC Consulting, Inc. was responsible for the utilities design and construction management services for the Miami-Dade Parks & <br />Recreation Metroozoo - “Wings of Asia” Aviary. This project involves the <br />extension, connection and permitting of water and sanitary sewer service <br />for the Aviary. The project requires the determination of the existing pump <br />station capacity at the Metrozoo and the ability to handle the new loads <br />from the Aviary. A 12” water main extension was provided as well as a <br />connection to an existing main. EAC’s responsibility also included the <br />design of drainage systems for the Aviary, the paving and grading of the <br />entrance driveways into the Aviary, and the pedestrian bridges on the <br />project. <br />PROJECT COST: $3.5 million <br />PROJECT FEES: $55,000 <br />25.FIRMS FROM SECTION INVOLVED WITH THIS PROJECT <br />a. <br />(1)FIRM NAME <br />EAC Consulting, Inc. <br />(2) FIRM LOCATION (City and State) <br />Miami, FL <br />(3) ROLE <br />Prime <br />b. (1)FIRM NAME (2) FIRM LOCATION (City and State)(3) ROLE <br />c. (1)FIRM NAME (2) FIRM LOCATION (City and State)(3) ROLE <br />d. (1)FIRM NAME (2) FIRM LOCATION (City and State)(3) ROLE <br />e. <br />(1)FIRM NAME (2) FIRM LOCATION (City and State)(3) ROLE <br />f. <br />(1)FIRM NAME (2) FIRM LOCATION (City and State)(3) ROLE <br />SF330Project Experience - EAC Consulting, Inc.
The URL can be used to link to this page
Your browser does not support the video tag.