Laserfiche WebLink
F.EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'SQUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.) <br />20.EXAMPLE PROJECT <br />KEY NUMBER <br />(9) 21.TITLE AND LOCATION (City and State) <br />Professional Services Agreement for Civil Engineering Services <br />22.YEAR COMPLETED <br />PROFESSIONAL <br />SERVICES <br />2016-Present <br />CONSTRUCTION (If <br />applicable) <br />23.PROJECT OWNER'S INFORMATION <br />a.PROJECT OWNERVillage of Key Biscayne b.POINT OF CONTACT NAMEAna Varona c. POINT OF CONTACT TELEPHONENUMBER 305.365.7568 <br />24.BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) <br />The Village of Key Biscayne (VKB) encompasses 850 acres and is characterized by terrain topography <br />that is predominantly flat and low lying in relation to sea level. The elevations of the roadways are <br />approximately 3.5 feet to nearly 6 feet above mean sea level (MSL). Due to its close proximity to <br />Biscayne Bay and the Atlantic Ocean, the Village's stormwater management system is completely <br />influenced by tidal waters, which presents a challenge for stormwater disposal systems. The fluctuating <br />sea levels directly affect the boundary conditions of the stormwater drainage systems within the Village. <br />EAC Consulting implemented a project approach methodology that proposed measures and systems <br />that serve to protect the Village. The measures protect residents and businesses from property <br />damage and quality of life disruptions that are associated with excessive flooding and prolonged <br />staging of water. <br />Projects: <br />•Task 2 - Stormwater Improvement Implementation Plan <br />•Emergency Pump Station Maintenance Evaluation for Ocean Lane Pump Station and <br />East Heather Drive Pump Station <br />•K-8 Sanitary Sewer System Relocation and Extension Design <br />•401 Hampton Lane - Phase 1 Assessment <br />•Beach Physical Monitoring Services <br />•FDEP Local Government Funding Request Support Services <br />•Year 7 NNS Biological Monitoring <br />•Year 1 Post Construction Biological Monitoring <br />•Phase V Village-wide Lighting Improvements <br />•Beach Renourishiment <br />•Toddler Park Lighting <br />•Mashta Bridge Repair <br />•Fernwood Lighting <br />•Beach Renourishment Post Design Services <br />•Kite Surfing Channel <br />•Beach Renourishment - Biological <br />Monitoring <br />•Park Pavillions <br />•Beach Management Feasibility and <br />Technical Support Services <br />•Basketball Courts Cover <br />•No name Shoal Biological Monitoring <br />•Buoy Design for Kite Surfing Channel <br />25.FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT <br />a. <br />(1) FIRM NAME <br />EAC Consulting, Inc. <br />(2) FIRM LOCATION (City and State) <br />Miami, FL <br />(3) ROLE <br />Prime <br />b. <br />(1) FIRM NAME (2) FIRM LOCATION (City and State)(3) ROLE <br />c. <br />(1) FIRM NAME (2) FIRM LOCATION (City and State)(3) ROLE <br />d. <br />(1) FIRM NAME (2) FIRM LOCATION (City and State)(3) ROLE <br />e. <br />(1) FIRM NAME (2) FIRM LOCATION (City and State)(3) ROLE <br />f. <br />(1) FIRM NAME (2) FIRM LOCATION (City and State)(3) ROLE <br />STANDARD FORM 330 (REV. 8/2016) PAGE 3