Laserfiche WebLink
19.RELEVANT PROJECTS <br />a. <br />(1)TITLE AND LOCATION (City and State)PD&E Study for Venetian Causeway – FDOT District 6 YEARS COMPLETED <br />PROFESSIONAL SERVICES <br />2014- Present (5 years) <br />CONSTRUCTION <br />NA <br />(3)BRIEF DESCRIPTION (Brief Scope, Size, Cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm <br />The project requirements include the inspection of the bridges, engineering reports, environmental documents, a Section 4(f) document and <br />preliminary plans. Assistant Project Manager and Structural Engineer responsible for conceptual Structural Analysis and design of the ten low- <br />level fixed span bridges, preparation of Preliminary Engineering Report study documents, public involvement workshops and activities, and <br />coordination with sub-consultants and agencies. The Venetian Causeway bridges (ten low-level fixed spans and two movable bascules) from <br />North Bayshore Drive in Miami to Purdy Avenue in Miami Beach were originally built in 1926 and have been designated as historic landmarks by <br />the City of Miami and City of Miami Beach; they are also listed on the National Register of Historic Places (NRHP). Extensive public <br />involvement efforts are being done as part of this study. The PD&E study will look at alternatives that satisfy the public; protect the environment; <br />are sensitive to the historic designation; result in bridges that are safe, maintainable and serve the needs of the public. <br />b. <br />(1)TITLE AND LOCATION (City and State)Additional Elevators and Overhaul at the Dadeland North Metrorail Station Parking Garage - DTPW, Miami-Dade Transit <br />YEARS COMPLETED <br />PROFESSIONAL SERVICES <br />2016 <br />CONSTRUCTION <br />NA <br />(3)BRIEF DESCRIPTION (Brief Scope, Size, Cost, etc.) AND SPECIFIC ROLE [ ] Check if project performed with current firm <br />Lead Engineer Project consisted of the Design-Build RFP Development. Responsible for project management tasks, structural inspection, <br />preparation of construction documents and specifications, cost estimating, and engineering support services. The Design-Build RFP <br />development included Design and Construction Requirements, Construction Technical Specifications, and Conceptual Design Plans for the new <br />elevator tower on the northern end of the existing parking garage, a new prefabricated Bus Operator Supervisor’s booth, a new canopy along <br />the eastern side of the existing parking garage; modernization of existing elevators; and the overhaul and renewal of the existing parking. The <br />project included extensive coordination with Miami-Dade Transit and DTPW facilities to meet all design and construction requirements. <br />c. <br />(1)TITLE AND LOCATION (City and State)NW South River Drive Bridge over Tamiami River Canal - Miami-Dade County YEARS COMPLETED <br />PROFESSIONAL SERVICES <br />2010 – 2014 (4 years) <br />CONSTRUCTION <br />2014 - 2019 <br />(3) BRIEF DESCRIPTION (Brief Scope, Size, Cost, etc.) AND SPECIFIC ROLE [ ] Check if project performed with current firm <br />Preliminary Study and Final Design of a 123-foot simple trunnion single leaf through-girder bascule span bridge to replace the Tamiami Canal <br />Historical Swing Bridge constructed in 1921. The project includes providing a 4 lane wide bridge with 6 foot and 12 foot shared sidewalks and <br />control house within a 50 foot limited right-of-way and low bridge profile which resulted in the need to use through-bascule girders. The floor <br />system consists of floor beams and an exodermic bridge deck with no steel stringers and lateral bracing. Architectural features to the bridge and <br />control house are also included in the detail design. Structural Engineer responsible for the design of the single leaf bascule span bridge steel <br />plate bascule floor-beams, design and detailing of the rest pier which includes pile, wall design, design and detail of seawall, quantities and cost <br />estimate of finished project. <br />d. <br />(1) TITLE AND LOCATION (City and State)Flagler Memorial Bridge SR A1A over ICWW - FDOT District 4 YEARS COMPLETED <br />PROFESSIONAL SERVICES <br />2011-2014 <br /> CONSTRUCTION <br />2018 <br />(3)BRIEF DESCRIPTION (Brief Scope, Size, Cost, etc.) AND SPECIFIC ROLE [ ] Check if project performed with current firm <br />$95 million Design/Build contract to replace twin double leaf bascule span bridge with a 150’ rolling lift span over the navigable channel, 12- <br />150 foot pre-stressed concrete approach spans and approach roadway work. Project maintains traffic on existing bridge during construction of <br />the new bridge. Structural Engineer responsible for approach substructure design (bascule pier walls, columns and beams) and abutment <br />design including concrete monument support structure on drilled shaft foundations. Structural Engineer responsible for LRFR bridge load ratings <br />for cast-in-place reinforced concrete slabs. <br />e. <br />(1) TITLE AND LOCATION (City and State)Sunny Isle Bascule Span Retrofit, Dade County, FL - FDOT District 4 YEARS COMPLETED <br />PROFESSIONAL SERVICES <br />2007 <br /> CONSTRUCTION <br />2008 <br />(3)BRIEF DESCRIPTION (Brief Scope, Size, Cost, etc.) AND SPECIFIC ROLE [ ] Check if project performed with current firm <br />Mathematical balance and dynamic strain gage measurement to determine bascule span balance condition for this four leaf bascule span <br />bridge. Structural Engineer responsible for plans development and assisting Project Engineer with load calculations. <br />2E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />(Complete one Section E for each key person.) <br />12.NAME:Stephanie Romero, PE 13.ROLE IN THIS CONTRACT:Deputy Project Manager 14.YEARS EXPERIENCE <br />a.TOTAL: <br />14 <br />b.WITH CURRENT FIRM: 5 <br />15. FIRM NAME AND LOCATION (City and State): EAC Consulting, Inc. – 5959 Blue Lagoon Drive, Ste. 410, Miami, FL 33126 <br />16.EDUCATION (Degree and Specialization):2006 Bachelor of Science in Civil Engineering – New York University <br />Polytechnic School of Engineering <br />17.CURRENT PROFESSIONAL REGISTRATION (State and Discipline) Professional Engineer: Florida – 77593 <br />18.OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.):