Laserfiche WebLink
19.RELEVANT PROJECTS <br />a. <br />(1)TITLE AND LOCATION (City and State)Miramar Toll Plaza – Florida’s Turnpike Enterprise - Miramar, FL. YEARS COMPLETED <br />PROFESSIONAL SERVICES <br />2006 <br />CONSTRUCTION <br />2015 <br />(3) BRIEF DESCRIPTION (Brief Scope, Size, Cost, etc.) AND SPECIFIC ROLE X [X] Check if project performed with current firm Roadway Design Engineer supporting the geometric redesign of the existing Miramar Toll Plaza in Broward County, Florida. Additional duties <br />included assisting with the traffic control plan which for the 1.2-mile of Turnpike mainline widening, the reconstruction of the Turnpike westbound <br />exit ramp to University Drive and roadway improvements to NW 215th Street (County Line Road). <br />b. <br />(1)TITLE AND LOCATION (City and State)Sand Lake (SR-482) Project – Florida Department of Transportation, District V YEARS COMPLETED <br />PROFESSIONAL SERVICES <br />2017 <br />CONSTRUCTION <br />Ongoing <br />(3)BRIEF DESCRIPTION (Brief Scope, Size, Cost, etc.) AND SPECIFIC ROLE [ ] Check if project performed with current firm <br />Maintenance of Traffic Lead Engineer providing Value Engineering Services for this DB project delivering an innovative MOT solution that <br />supported construction of new concrete pavement from Greenbriar Parkway to west of John Young Parkway including the Shingle Creek Bridge <br />Replacement. <br />c. <br />(1)TITLE AND LOCATION (City and State)SR-836/NW-87th Avenue Project – Miami-Dade Expressway Authority - Miami, FL <br />YEARS COMPLETED <br />PROFESSIONAL SERVICES <br />2015 <br />CONSTRUCTION <br />Ongoing <br />(3)BRIEF DESCRIPTION (Brief Scope, Size, Cost, etc.) AND SPECIFIC ROLE [ ] Check if project performed with current firm <br />Senior Highway Engineer in charge of the coordination and development of temporary traffic control plans for the reconstruction of the <br />SR-836/NW 87th Avenue (Galloway Road) Interchange in Miami-Dade County. This conventional design project also includes the <br />construction of seven new bridges along with roadway improvements to NW 87th Avenue and NW 12th Street. <br />d. <br />(1) TITLE AND LOCATION (City and State)Design-Build Project for SR-9/I-95 Widening from North of SR-60 to Indian River/Brevard County Line – Florida Department of Transportation, District IV <br />YEARS COMPLETED <br />PROFESSIONAL SERVICES <br />2013 <br /> CONSTRUCTION <br />2017 <br />(3)BRIEF DESCRIPTION (Brief Scope, Size, Cost, etc.) AND SPECIFIC ROLE [ ] Check if project performed with current firm <br />Senior Highway Engineer in charge of the development of the traffic control plan scheme for the 13-mile inside widening of I-95, the construction <br />of 16 box/bridge culverts along the corridor and the reconstruction of the I-95/CR-512 (Fellsmere Road) Interchange in Indian River county. <br />e. <br />(1) TITLE AND LOCATION (City and State)Design-Build Project for Central Boulevard Widening, Realignment and <br />Service Loop – Miami- Dade Expressway Authority - Miami, FL <br />YEARS COMPLETED <br />PROFESSIONAL SERVICES <br />2011 <br /> CONSTRUCTION <br />2015 <br />(3)BRIEF DESCRIPTION (Brief Scope, Size, Cost, etc.) AND SPECIFIC ROLE [ ] Check if project performed with current firm <br />Senior Highway Engineer in charge of coordinating and developing maintenance of traffic plans. The project had the primary goal of separating <br />commercial traffic from passengers with the introduction of service roads to accommodate the commercial traffic in and out of the Miami <br />International Airport. The project also included widening, reconstruction and roadway improvements of Central Boulevard from MIA upper and <br />lower terminals to LeJeune Road as well as the reconstruction of NW 20th Street to a 4-lane divided road. <br />2E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />(Complete one Section E for each key person.) <br />12.NAME:Cesar Quiroz, PE 13.ROLE IN THIS CONTRACT:MOT Engineer 14.YEARS EXPERIENCE <br />a.TOTAL: <br />23 <br />b.WITH CURRENT FIRM: 1 <br />15.FIRM NAME AND LOCATION (City and State): EAC Consulting, Inc. – 5959 Blue Lagoon Drive, Suite 410, Miami, FL 33126 <br />16.EDUCATION (Degree and Specialization): <br />2009 Bachelor of Science in Civil Engineering Pontificia Universidad <br />Católica del Perú <br />1996 Bachelor of Science in Civil Engineering Florida International <br />University <br />17.CURRENT PROFESSIONAL REGISTRATION (State and Discipline) Professional Engineer: Florida – 59472 <br />18.OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.): Advanced MOT Training