Laserfiche WebLink
19.RELEVANT PROJECTS <br />a. <br />(1)TITLE AND LOCATION (City and State)SR 836 Design/Build (MDX 83622) – Miami-Dade Expressway Authority <br />YEARS COMPLETED <br />PROFESSIONAL SERVICES <br />2008 <br />CONSTRUCTION <br />2012 <br />(3)BRIEF DESCRIPTION (Brief Scope, Size, Cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firmProject Manager of an eastbound auxiliary lane along Dolphin Expressway (State Road 836), from West of Northwest 57th Avenue to Northwest <br />42nd Avenue. The Project includes an outside auxiliary lane construction with bridge widenings at Northwest 57th Avenue, Tamiami (C-4) Canal <br />and Northwest 45th Avenue, ITS relocation, milling and resurfacing, ramp modifications, guardrail installation, drainage improvements, retaining <br />wall systems, lighting and signage modifications. Construction Amount: $16 Million. <br />b. <br />(1)TITLE AND LOCATION (City and State)NW 105th Way Bridge – Emergency Repair from US 27 (Okeechobee Road) to N.W. South River Drive <br />YEARS COMPLETED <br />PROFESSIONAL SERVICES <br /> 2013 <br />CONSTRUCTION <br />2013 <br />(3)BRIEF DESCRIPTION (Brief Scope, Size, Cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm <br />Town of Medley in conjunction with FDOT. Construction Manager for this project with responsibilities that included repair bridge deck <br />and barrier wall. Construction of barrier wall, guardrail, bridge expansion joints, mill and resurface asphalt, and pavement markings. <br />c. <br />(1)TITLE AND LOCATION (City and State)Pine Island Road from Oakland Park Boulevard to Commercial Boulevard – City of Sunrise, FL <br />YEARS COMPLETED <br />PROFESSIONAL SERVICES <br />2010 <br />CONSTRUCTION <br />2011 <br />(3)BRIEF DESCRIPTION (Brief Scope, Size, Cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm <br />Construction Manager responsible for RFI’s, change orders, pay requests and plan interpretation for this project involving the reconstruction and <br />widening of the existing 4-lane facility, to a 6-lane divided facility including bike lanes, sidewalk, 30-inch ductile iron (DIP) water main, drainage <br />system, street lighting, signalization, landscaping, irrigation system, signing and pavement markings. <br />d. <br />(1) TITLE AND LOCATION (City and State)SR-934/ NW 79th Street Roadway Improvements Projects – FDOT District 6, <br />City of Miami, FL <br />YEARS COMPLETED <br />PROFESSIONAL SERVICES <br />2014 <br /> CONSTRUCTION <br />Ongoing <br />(3)BRIEF DESCRIPTION (Brief Scope, Size, Cost, etc.) AND SPECIFIC ROLE [ X ] Check if project performed with current firm <br />Senior Project Engineer, overseeing this grouping project which consists of the roadway improvements including milling and resurfacing, <br />signalizations, lighting, ADA improvements, drainage improvements, bridge traffic railing replacement, signing and pavement marking <br />improvements on NW 79th street from 14th Avenue to North Bayshore Drive, NW 79th street from 14th Avenue to 28th Avenue, and NW 27th <br />Avenue from NW 79th Street to NW 103rd Street <br />e. <br />(1) TITLE AND LOCATION (City and State)SR-836/I-395 Interim Project from NE 1st Avenue to MacArthur Causeway – FDOT District 6, Miami-Dade County, FL <br />YEARS COMPLETED <br />PROFESSIONAL SERVICES <br />2012 <br /> CONSTRUCTION <br />2015 <br />(3)BRIEF DESCRIPTION (Brief Scope, Size, Cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm <br />Project Engineer responsible for the inspection and contract administration of this project involving roadway and minor bridge upgrades on SR- <br />836 and I-395. The roadway and bridge improvements under the I-395 project consist of roadway and bridge widening, milling and resurfacing, <br />retaining walls, barrier walls, signing, drainage, lighting, etc. <br /> STANDARD FORM 330 (REV. 3/2013) PAGE 2 <br />2E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />(Complete one Section E for each key person.) <br />12.NAME:Jenner Alfaro, P.E. 13.ROLE IN THIS CONTRACT:Senior Project Engineer (Construction Management CEI Services) <br />14.YEARS EXPERIENCE <br />a.TOTAL:38 b.WITH CURRENT FIRM:10 <br />15.FIRM NAME AND LOCATION (City and State): EAC Consulting, Inc. – 5959 Blue Lagoon Drive, Ste. 410, Miami, FL 33126 <br />16.EDUCATION (Degree and Specialization):1987 Masters in Civil Engineering/ Purdue University, West Lafayette, IN 1977 Bachelors of Science in Civil Engineering/Universidad de Costa Rica, San Jose, Costa Rica <br />17.CURRENT PROFESSIONAL REGISTRATION (State and Discipline) Professional Engineer: Florida 51855 (Civil) <br />OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.): Florida Engineering Society, Transportation Construction Management Institute