My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
EAC Consulting, Inc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(20-10-01) Professional Engineering and Architectural Services for Ped.
>
Responses
>
EAC Consulting, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/23/2020 11:01:33 AM
Creation date
11/23/2020 10:59:19 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
260
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />(Complete one Section E for each key person.) <br />12. NAME 13. ROLE IN THIS CONTRACT 14.YEARS EXPERIENCE <br />Jose Fonseca Landscape Architectural Designer a. TOTAL b. WITH CURRENT FIRM <br />7 8 months <br />15. FIRM NAME AND LOCATION (City and State) <br />Savino & Miller Design Studio, P.A., North Miami, Florida <br />16. EDUCATION (DEGREE AND SPECIALIZATION)17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) <br />Florida International University, MLA <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) <br />ASLA Member <br />19. RELEVANT PROJECTS <br />a. <br />(1) TITLE AND LOCATION (City and State)(2)YEAR COMPLETED <br />City of Miami Beach Future Community Park <br />Miami Beach, Florida <br />PROFESSIONAL SERVICES CONSTRUCTION (if applicable) <br />2016-present <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE x Check if project performed with current firm <br />Landscape Master Plan for this future community park project in Miami Beach. Scope included Paving, Planting, Site furniture <br />and lighting. <br />Project Designer <br />b. <br />(1) TITLE AND LOCATION (City and State)(2)YEAR COMPLETED <br />Coral Gables Dog Park <br />Miami Beach, Florida <br />PROFESSIONAL SERVICES CONSTRUCTION (if applicable) <br />2016-present <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE X Check if project performed with current firm <br />Streetscape improvements as part of Miami Beach’s initiative to raise West Avenue. <br />Project Manager <br />c. <br />(1) TITLE AND LOCATION (City and State)(2)YEAR COMPLETED <br />Akara Mixed-Use Tower <br />Miami, Florida <br />PROFESSIONAL SERVICES CONSTRUCTION (if applicable) <br />2019-present <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE X Check if project performed with current firm <br />High-rise mixed-use tower in Downtown. SD-CA. <br />Project Manager <br />d. <br />(1) TITLE AND LOCATION (City and State)(2)YEAR COMPLETED <br />Atlanta Sobu Hotel <br />Atlanta, GA <br />PROFESSIONAL SERVICES CONSTRUCTION (if applicable) <br />2019-present <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE X Check if project performed with current firm <br />Open space master plan and design for this condominium turned hotel in Atlanta <br />Project Designer <br />e. <br />(1) TITLE AND LOCATION (City and State)(2)YEAR COMPLETED <br />Midtown Miami Community Park <br />Miami, Florida <br />PROFESSIONAL SERVICES CONSTRUCTION (if applicable) <br />2019 <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firmThe design of a new community park in Midtown Miami between high rise residential condominium <br />EXLOGLQJV6SHFL¿FVFRSHLQFOXGHGVLWHSODQQLQJH[LVWLQJWUHHGLVSRVLWLRQDQGPLWLJDWLRQKDUGVFDSHOD\RXWDQGVLWHJUDGLQJ <br />planting design, irrigation design, and landscape lighting design. <br />Project Manager
The URL can be used to link to this page
Your browser does not support the video tag.