My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
EAC Consulting, Inc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(20-10-01) Professional Engineering and Architectural Services for Ped.
>
Responses
>
EAC Consulting, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/23/2020 11:01:33 AM
Creation date
11/23/2020 10:59:19 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
260
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
E.RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />(Complete one Section E for each key person.) 12. NAME 13.ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE <br />Daniel Vasini Project leader - Architect a. TOTAL <br />13 lb. WITH CURRENT FIRM <br />11 15. FIRM NAME AND LOCATION (City and State) <br />West 8 urban design & landscape architecture p.c. New York, NY <br />16.EDUCATION (Degree and Specialization) 17, CURRENT PROFESSIONAL REGISTRATION (State end Discipline) <br />Southern California Institute for Architecture -Msc Architecture N/A Rafael Urdaneta University School of Architecture - <br />Architecture Diploma <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Puolications, Organizations, Training, Awards, etc.) <br />Design for Miami Beach Soundscape. NY Chapter, 2015 New York ASLA; Honor Award landscape Architecture Design <br />for Governors Island Phase 1 Park. NY Chapter, 2015 New York ASLA. <br />a. <br />b. <br />C. <br />d. <br />e. <br />19.RELEVANT PROJECTS(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br />Pride Park -Miami Beach, Fl PROFESSIONAL SERVICES,CONSTRUCTION (If applicaole) <br />2016-2020 2020 (3) BRIEF DESCRIPTION (Brief scc,pe, size, cc,st, etc.) AND SPECIFIC ROLE 0 Check if project performed with current firm <br />Pride Park is a 5.4 acre park, which is designed to host tented events such as Design Miami, and other activities. Cost - <br />$8 million. West 8 was the Lead landscape Architects from concept design through construction; Mr. Vasini's role was <br />Design Director -he lead the design effort and oversaw the documentation and construction phases. = (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br />MBCC Public Spaces -Miami Beach, Fl PROFESSIONAL SERVICES,CONSTRUCTION (If applicaole) <br />2016-2020 2020 (3) BRIEF DESCRIPTION (Brief scc,pe. size, CCJSI, etc.) AND SPECIFIC ROLE 0 Check if project performed with current firm <br />The 6 acres of landscape surrounding the newly constructed Miami Beach Convention Center was a $3.5 million effort, <br />which includes a living shoreline and sculpture garden along Collins Canal. West 8 was the lead landscape Architects <br />from concept design through construction; Mr. Vasini's role was Design Director -he lead the design effort and oversaw ........ ............ .-:ll_..., � ...... : ..... - ' (1) TITLE AND LOCATION (City and State) <br />Oirschot Bridge -Oirschot, The Netherlands (3) BRIEF DESCRIPTION (Brief scc,pe, size, cc,st, etc.) AND SPECIFIC ROLE <br />(2) YEAR COMPLETED PROFESSIONAL SERVICES,CONSTRUCTION (If applicao/e) <br />2012-2016 2020 0 Check if project performed with current firm <br />The slow traffic bridge in Oirschot, a historical town in the south of The Netherlands, was opened in 2020. Conceived by <br />West 8, the elegant and simple truss is ground-breaking in its use of wood as a primary material to span the 40 meter clearing across the Wilhelmina Canal. Mr. Vasini served as a lead designer on the project in the design phases. !! (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br />Wenduine Bridge -Belgium PROFESSIONAL SERVICES,CONSTRUCTION (If applicaole) <br />2005 2014 (3) BRIEF DESCRIPTION (Brief scc,pe, size, cc,st, etc.) AND SPECIFIC ROLE 0 Check if project performed with current firm <br />This 83m long bridge was commissioned as a Design Competition. West 8's design, which was deemed the best of the <br />five plans submitted, harnesses the natural context, celebrates the site's historical significance and takes into <br />consideration the existing spatial structure of the nearby 'Uitkerkse Paider. = (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED PROFESSIONAL SERVICES,CONSTRUCTION (If app/icaole) <br />(3) BRIEF DESCRIPTION (Brief scope. size. cost, etc.) AND SPECIFIC ROLE 0 Check if project performed with current firm <br />STANDARD FORM 330 (REV. 8/2016) PAGE 2
The URL can be used to link to this page
Your browser does not support the video tag.