Laserfiche WebLink
E.RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />(Complete one Section E for each key person.) 12. NAME 13. ROLE IN THIS CON TRACT 14. YEARS EXPERIENCE <br />Adriaan Geuze Design Director - Architect <br />a. TOTAL 35 lb. WITH CURRENT FIRM 30 15. FIRM NAME AND LOCATION (CityandState) <br />West 8 urban design & landscape architecture p.c. New York, NY16. EDUCATION (Degree and Specialization) <br />Wageningen University & Research <br />Ir , Landscape Architecture, 1987 <br />17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline) <br />Stichting Bureau Architectenregister, ASLA, OALA <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) <br />Prix-de-Rome. Maaskant Prize, Oeuvre Prize for Architecture of the Mondriaan Fund, Architect of the Year, ARC Oeuvre <br />Award, Veronica Rudge Green Prize for Urban Design (Harvard Design School), and various awards from the American <br />Society for Landscape Architecture <br />a. <br />b. <br />C. <br />19.RELEVANT PROJECTS(1) TITLE AND LOCATION (City and state) (2) YEAR COMPLETED <br />Roosendaal Pedestrian Bridge -Roosendaal, The Netherlands <br />PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) 2012-2014 2014 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [Z] Check if project performed with current firm <br />Cost -$4.9 million. The bridge design is based on structural, functional and visual amenity determinants and a search <br />for a strong character created by means of a simple construction. The proposed bridge provides an answer to this overall <br />context by a balanced combination and integration of shape, structure and construction. Mr. Geuze served as the design <br />lead on the project. (1) TITLE AND LOCATION (City and state) <br />The Twist Bridge -Vlaadingen Vaart, The Netherlands (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE <br />(2) YEAR COMPLETED PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) 2005-2009 2009 [Z] Check if project performed with current firm <br />The three-dimensional truss of the 42m long bridge, made from square steel profiles, twists on its horizontal axis. This <br />twisted space frame construction absorbs the user in a continually changing experience of of perspective. The <br />rectangular frame at the bridge entrance evolves into a double-height diamond form in the middle. Mr. Geuze served as <br />the design lead on the project. (1) TITLE AND LOCATION (City and state) <br />Oirschot Bridge -Oirschot, The Netherlands (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE <br />(2) YEAR COMPLETED PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) <br />2012-2016 202 0 [Z] Check if project performed with current firm <br />The slow traffic bridge in Oirschot, a historical town in the south of The Netherlands, was opened in 2020. Conceived by <br />West 8, the elegant and simple truss is ground-breaking in its use of wood as a primary material to span the 40 meter <br />clearing across the Wilhelmina Canal. Mr. Geuze served as the design lead on the project. <br />(1) TITLE AND LOCATION (City and state) (2) YEAR COMPLETED <br />Wenduine Bridge -Belgium <br />PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) 2005 2014 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [Z] Check if project performed with current firm d. . . . . .. . . . This 83m long bndge was commIssI oned as a Design CompetItIon. West S's design, which was deemed the best of the <br />e. <br />five plans subm itted, harnesses the natural context, celebrates the site's hist orical significance and takes into <br />consideration the existing spatial structure of the nearby 'Uitkerkse Polder. Mr. Geuze served as the design lead on the <br />project. (1) TITLE AND LOCATION (City and state) <br />Borneo-Sporenburg -Amsterdam, The Netherlands (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE <br />(2) YEAR COMPLETED PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) 1993-1997 1997 [Z] Check if project performed with current firm <br />The three bridges of Borneo/Sporenburg by West 8 play an essential role at the creation of the unique atmosphere in the <br />harbour-residential area. Two of the bridges, one on the West side and the other on the East side, span the 93-meter <br />wide water of the Railroad basin and connect the islands of Borneo and Sporenburg. The third bridge is situated in the <br />line of the East bridge and spans the 25-meter wide inland port. Mr. Geuze served as the design lead on the project. <br />STANDARD FORM 330 (REV. 8/2016) PAGE 2