Laserfiche WebLink
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />(Complete one Section E for each key person.) <br />12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE <br />Raul Amaya, PE a. TOTAL b. WITH CURRENT FIRM <br />34 1 Year <br />15. FIRM NAME AND LOCATION (City and State) <br />ASA CONSULTANTS, INC. Sunrise, Florida <br />16. EDUCATION (DEGREE AND SPECIALIZATION)17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) <br />B.S.C.E, University of Miami Florida PE No. 38523 <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) <br />19. RELEVANT PROJECTS <br />a. <br />(1) TITLE AND LOCATION (County)(2) YEAR COMPLETED <br />SR9/ I-95 3C Design-Build Project, FDOT-D4 (Broward County) PROFESSIONAL SERVICES CONSTRUCTION (if applicable) <br />On Going <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE ☒Check if project performed with current firm <br />ASA is the prime on this DB with Bergeron. This project involves widening the existing road and a new bridge (using the <br />developmental PSU beams) over the cypress canal. Mr. Rodriguez serves as ASA’s deputy project manager and Engineer of Record <br />for Roadway and Signing and Pavement Marking. Mr. Amaya is the SR. structural Engineer for this project helping with plan <br />Production. <br />b. <br />(1) TITLE AND LOCATION (County)(2) YEAR COMPLETED <br />Golden Gates Estates 8th Street NE DB Project | FDOT D1 – (FM <br />431895-1) <br /> (Collier County) <br />PROFESSIONAL SERVICES CONSTRUCTION (if applicable) <br />2 Years <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE ☒Check if project performed with current firm <br />ASA is the prime on this DB with Bergeron. This project involves widening the existing road and a new bridge (using the <br />developmental PSU beams) over the cypress canal. Mr. Amaya is the Sr. Structural Engineer for this project. <br />c. <br />(1) TITLE AND LOCATION (County)(2) YEAR COMPLETED <br />Sunny Isles NB Emergency Bridge <br />Miami Dade County <br />PROFESSIONAL SERVICES CONSTRUCTION (if applicable) <br />2 Years <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />Design and construction plans for emergency pedestrian bridge over inter coastal waterway . Mr. Raul Amaya helped with the <br />design and bridge plans preparation. <br />d. <br />(1) TITLE AND LOCATION (County)(2) YEAR COMPLETED <br />I-595 Reversible Lanes Design-Build project | FDOT D4 <br />( Broward County) <br />PROFESSIONAL SERVICES CONSTRUCTION (if applicable) <br />4 Years <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />As a sub consultant to AECOM on this high-profile $1.3B Design-Build project, Mr. Amaya was invol ved in structural design <br />effort on Zones 1, 2, 3, 4 and 6. The structural design effor t consisted of final design and development of complete <br />structural plans for Section1, 2 and 4 of this project corridor. <br />e. <br />(1) TITLE AND LOCATION (County)(2) YEAR COMPLETED <br />I-75/I-595 Interchange, Phase 2 | FDOT D4 <br />( Broward County) <br />PROFESSIONAL SERVICES CONSTRUCTION (if applicable) <br />4 Years <br />(3)BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />Three, twin-box girder bridges (Overall length 1,216 ft.) and two single box girder bridges (Overall length 3,612 ft.) Mr. Amaya was <br />involved <br />in the superstructure design of all segmental bridges. <br />Bridge Design Peer Review