My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2020-3143
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2020
>
Reso 2020-3143
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/28/2021 2:58:49 PM
Creation date
12/9/2020 11:49:41 AM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2020-3143
Date (mm/dd/yyyy)
11/19/2020
Description
1st Amendment w/CGA for construction engineering inspection services for the streetlight project.
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
o Calculations for needed fire flow for site demands, based on building type use and <br />size, if required. <br />o Calculations of off -site flood stages. <br />o Off -site engineering and negotiations for off -site easements, if required (other <br />than as specified in the Scope of Services). <br />o Permit application or negotiation with permitting authorities other than those <br />specifically 'Listed herein. <br />o Preparation of construction contract documents, other than drawings and technical <br />specifications (e.g., bid schedule, project manual). <br />o Professional land surveying not included in the scope of services (i.e., buried <br />utility investigation, easement research, condominium documents, project <br />stakeout and as -built drawings). <br />o Professional services required due to conditions different from those itemized <br />under the Scope of Services or due to events beyond the control of Calvin, <br />Giordano & Associates, Inc. <br />o Professional services required, due to changes in the site plan initiated by the <br />CLIENT, their representatives or other consultants (e.g., architects, landscape <br />architects, etc.) after either design or preparation of the construction drawings has <br />commenced. <br />o Special shop drawing annotation and modification to expedite shop drawing <br />approval process. <br />o Updated boundary survey, site evaluation or closing assistance work, unless <br />specified above. <br />IV. REIMBURSABLE EXPENSES: Calvin, Giordano & Associates, Inc. and its consultants <br />will be reimbursed for the printing of drawings and specifications, deliveries, Federal Express <br />services, required travel time and travel expenses, long distance telephone calls, fax transmittals, <br />postage, fees paid for securing approval of authorities having jurisdiction over the project, <br />renderings, models and mock-ups required by CLIENT, as required. Reimbursable expenses and <br />sub -consultant invoices will be billed directly to the CLIENT at a multiplier of 1.25. <br />V. MEETING ATTENDANCE: Due to the difficulties of predicting the number or duration of <br />meetings, no meetings other than those listed above, are included in the Schedule of Fees shown <br />below. Preparation for and meeting attendance, as necessary, will be provided on a time and <br />materials basis and will be billed at the standard hourly rates. <br />
The URL can be used to link to this page
Your browser does not support the video tag.