Laserfiche WebLink
St5URCEWELl. <br />Book 2 — IC.CC Standard Terms and Conditions. and Contract General Conditions <br />34 of the Agreement General Conditions. <br />8.5 Delivery of the Proposal Package <br />8.5.1 After Sourcewell for their designated representative) reaches an agreement with the <br />Contractor on the Proposal Package and any requested revision thereto, if applicable, <br />Sourcewell (or their designated representative) will assemble and deliver the <br />Proposal Package for the Sourcewell Member's consideration. <br />8.6 Review of the Proposal Package by the Sourcewell Member and Issuance of Purchase carder <br />8.6.1 The Sourcewell Member will evaluate the entire Proposal Package. <br />8.6.2 The Sourcewell Member may reject a Proposal Package for any reason <br />8.6.3 The Sourcewell Member may request changes to or clarifications of any part of the <br />Proposal Package, may require certificates of insurance, and may require a Labor and <br />Material Payment Bond and Performance Bond. The Contractor and Sourcewell (or <br />their designated representative) will work together to make any requested revisions <br />in a timely manner and resubmit a revised Proposal Package. <br />8.6.4 Upon approval of the Proposal Package by Sourcewell (or their designated <br />representative) and the Sourcewell Member, the Sourcewell Member may issue a <br />signed Purchase Order, Notice of Award, or similar document accepting the <br />Contractor's offer. The document will include: <br />a. Reference to the Detail Scope of Work <br />b. The Purchase Order Price <br />c. Start date, Purchase Order Completion Time (duration) and completion date <br />d. Whether liquidated damages will apply <br />8.6.5 When the Work Order Package is accepted, the Sourcewell Member may send to the <br />Contractor a Purchase Order, or a notice of intent to award a Purchase Order <br />(sometimes used if bonding is required) or a similar document. <br />8.6.6 Once a Contractor has accepted the Purchase Order then the Contractor may not <br />refuse to perform the work. Such actions may be grounds for termination of this <br />Contract or other disciplinary action at the option of Sourcewell <br />8.6.7 If performance and payment bonding is required, or if a separate and Jorspecial <br />insurance certificate is required, the Contractor will deliver such requirement to the <br />Sourcewell member within ten (10) days of notification of the requirement. <br />9. CHANGES <br />9.1 The Sourcewell Member reserves the right to make, in writing, at any time during the Work, <br />changes in the Detailed Scope of Work as are necessary to satisfactorily complete the Project, <br />and to delete in whole or in part, or to add to, the Detailed Scope of Work. Such changes, <br />deletions, or additions will not invalidate the Agreement or the Purchase Order nor release <br />the surety, if any, and the Contractor agrees to perform the Work as altered. <br />9.2 All changes, deletions, and additions to the retailed Scope of Work will be reflected in a <br />Supplemental Purchase Order developed and priced in accordance with the procedure for <br />developing and approving all Price Proposals. <br />12 $ectlon T7,+ o — contract Ccnerai Canditions. NIFirch 2019 <br />