Laserfiche WebLink
Additional Service Request <br />TO Lawrence Kline FROM James Quinn <br />COMPANY Perkins + Will DATE November 12, 2020 <br />RE ASR-004 PROJECT NO. K18051.00 <br />FEE TYPE Timecard SUB/PHASE NO. MPT Plan <br />CC Jose Bofill, Michelle Olender, Brad PROJECT Sunny Isles Beach Pedestrian Bridge <br />Malmsten NAME <br />ASR DESCRIPTION MPT Plan <br />ASR BACKGROUND & SCOPE <br />Based on preliminary feedback from both the FDOT and the peer review engineer related to FDOT expectations, we <br />have concluded that the design team must develop the Maintenance and Protection of Traffic Plans (MPT) prior to <br />selection of a contractor. Thornton Tomasetti, Inc. (TT) is pleased to submit this Additional Service Request (ASR) to <br />provide expanded Engineering Services for Sunny Isles Beach pedestrian bridge (the project). We propose to <br />complete the additional scope on a time and materials basis. We understand the scope of services to include: <br />Single -Lane. Double -Lane and Total Roadway Closure <br />The project crosses over Florida State Road Al (Collins Avenue) which is a major thoroughfare in southern Florida. <br />It is our anticipation that the construction of the project will involve single -lane, double -lane and total closure of Al in <br />order to facilitate construction. In close coordination with the sequencing drawings TT is producing, we anticipate the <br />following lane closure drawings (working from left to right facing north): <br />• SB left lane single -lane closure for support tower work adjacent to the west curb line and cladding of the <br />bridge over the left lane. We anticipate this work during normal daytime hours. <br />• SB center and right lane double -lane closures for temporary shoring tower work in the median and cladding <br />of the bridge over the center and right lanes. We anticipate this work during nighttime hours. <br />• SB right lane single -lane closure for ancillary work in the median. We anticipate this work during normal <br />daytime hours. <br />• NB left lane single -lane closure for ancillary work in the median. We anticipate this work during normal <br />daytime hours. <br />• NB left and center lane double -lane closures for temporary shoring tower work in the median and cladding of <br />the bridge over the left and center lanes. We anticipate this work during nighttime hours. <br />• NB right lane single -lane closure for support tower work adjacent to the east curb line and cladding of the <br />bridge over the right lane. We anticipate this work during normal daytime hours. <br />• Total closure of the NB and SB roadways for the delivery and installation of the precast structure. We <br />anticipate this work during nighttime hours, along with a detour in place to utilize 178th Street, Atlantic <br />Boulevard and 183rd Street. <br />• Partial and total closure of the sidewalk for ancillary construction as needed. Pedestrian detour plans will be <br />included. <br />• Temporary closure of the crosswalk at 179th Street as needed to facilitate construction. Pedestrian detour <br />plans will be included. <br />101 NE Third Avenue, Suite 1 170 1 FL 33301 T954.903.9300 i +nrnn i.ThorntonTurnasetti.ccm <br />1/3 <br />