Laserfiche WebLink
ASR DESCRIPTION Additional Project Requirements Related to FDOT <br />4. Construction enineering requirements per FDOT <br />-Expanding construction sequencing plans to include elements such as walkway deck, railing, and <br />GFRC panels <br />+Submit calculations showing sequential load considerations <br />+Provide loads for temporary towers <br />-Detailed review of helical frame connection to primary structure <br />+Consideration of shipping and galvanization vat size in segmentation of helical facade structure <br />+Investigate alternative framing solutions that allow a clear, intuitive separation in load path between <br />the facade and primary structure <br />-Coordinate GFRC connection details with facade consultant <br />+Detail connections with facade consultant <br />+Coordinate movement requirements at joints <br />+Allowance for removal of panels for inspection <br />-Exposure or accessibility of connections for inspection as required per approved maintenance plan <br />-Evaluation of potential fit -up concerns <br />-Maintenance. plan discussions with the city and FDOT <br />The deliverables associated with this ASR shall be drawing submissions in conformance with FDOT requirements. <br />Based on the estimated fee build-up below, TT will carry out this additional service on a Time and Materials basis <br />with a Not -to -Exceed (NTE) amount of $105,000. We will provide notice to the Client In the event that 90% of the <br />NTE amount is reached. <br />FEE ESTIMATE <br />Managing Principal <br />Senior Principal <br />Senior Vice President/Principal <br />Vice President/Assoc. Principal <br />Senior Associate <br />Associate <br />Senior Project Engineer <br />Project Engineer <br />Senior Engineer <br />Engineer <br />Sr. Building Information Modeler <br />Building Information Modeler <br />Senior CAD Modeler <br />CAD Modeler <br />Admin Support <br />TIMECARD LABOR ESTIMATE: <br />MISC LABOR ESTIMATE <br />Expenses Estimate <br />TOTAL BUDGET ESTIMATE <br />Schedule <br />Hours <br />Rate <br />Amount <br />0 <br />$335 <br />$0 <br />0 <br />$335 <br />$0 <br />40 <br />$335 <br />$13,400 <br />0 <br />$320 <br />$0 <br />0 <br />$270 <br />$0 <br />60 <br />$255 <br />$15,300 <br />36 <br />$235 <br />$8,460 <br />0 <br />$225 <br />$0 <br />0 <br />$200 <br />$0 <br />0 <br />$180 <br />$0 <br />48 <br />$175 <br />$8,400 <br />0 <br />$175 <br />$0 <br />0 <br />$175 <br />$0 <br />0 <br />$175 <br />$0 <br />0 <br />$105 <br />$0 <br />$45,560.00 <br />$0.00 <br />$0.00 <br />$45,560.00 <br />After receiving all documentation requested to complete the additional scope of works, we expect that <br />deliverables associated with this additional service will be completed within: <br />925 Fort Stockton Drive, Suite 2001 Sfw Dip.g!) CA 921031 T 619.550.59001 www.ThorntonTomasetti.com <br />213 <br />