My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
RFP 21-06-01 Seasonal Experiential Activation (Final)
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFP
>
RFP No. 21-06-01 Seasonal Experiential Activation
>
RFP 21-06-01 Seasonal Experiential Activation (Final)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 3:49:11 PM
Creation date
6/15/2021 3:48:50 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />City of Sunny Isles Beach |Request for Proposal No. 21-06-01 17 <br /> <br />recruitment or recruitment advertising; layoff or termination; rates of pay or other forms of <br />compensation; and selection for training, including apprenticeship. <br /> <br />3.8 THE CITY’S ROLE AND RESPONSIBILITY <br /> <br /> The City assures the adequacy of utilities currently in place at the premises. The City shall pay <br /> for all electricity and water connected with the operation of this Activation during the term. <br /> <br />1. 3-phase, 480-volt, 600-amp continuous power supply available. City’s electrician to connect <br />City’s side of service, on a timely basis as per an established timeline to be issued prior to the <br />installation phase. <br />2. Continuous water supply available; hoses as necessary. <br />3. General grounds keeping of the Project Site. <br />4. Reserved curbside parking in close proximity to the site for Contractor’s installation and removal <br />phase. <br /> <br />3.9 RELEASE OF LIABILITY <br /> <br />The Contractor shall release and discharge the City of Sunny Isles Beach from any and all liability <br />for loss of merchandise, goods, equipment or other property of the Contractor or his agents if lost, <br />damaged, or destroyed by fire, theft, rain, water, storm, power/utility outages, riot, civil <br />disobedience, vandalism, or any other cause(s). <br /> <br />3.10 24-HOUR EMERGENCY SERVICE STAND-BY <br /> <br />Professional technicians available 24-hours per day, 7 days a week on a 2-hour response basis, for <br />all attraction components. <br /> <br />3.11 STAFFING <br />Contractor will be solely and wholly responsible for all staffing required to operate and maintain <br />the Activation. The Contractor will agree to be an equal opportunity employer and to not <br />discriminate on the basis of race, color, creed, sex, age, or any other protected classification. <br /> <br />3.12 CLEAN UP AFTER PROJECT IS COMPLETED <br /> <br />All unusable materials and debris shall be removed from the City premises. The successful <br />Contractor shall thoroughly clean up all areas at all times and after the season ends as mutually <br />agreed with the City’s project manager. <br /> <br />3.13 SPECIAL EVENTS <br /> <br />Subject to prior written approval from the City, the contractor may conduct special events or <br />programs at the premises. The contractor shall submit to the City for approval all plans for any <br />events or programs at the premises, and in no event shall the premises be closed to conduct private <br />activities during public hours of use except when such activities are specifically approved or
The URL can be used to link to this page
Your browser does not support the video tag.