My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2021-3204
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2021
>
Reso 2021-3204
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/28/2021 3:08:17 PM
Creation date
7/14/2021 1:56:19 PM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2021-3204
Date (mm/dd/yyyy)
06/17/2021
Description
Special Construction Agreement w/ Bellsouth Telecommunications, LLC, d/b/a AT&T Southeast, for Phase III of the undergrounding project.
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� �4r �e <br />F Lo" 4 <br />�`r* aF Sin FP4 <br />TO: <br />VIA: <br />FROM: <br />DATE: <br />RE: <br />City of Sunny Isles Beach <br />18070 Collins Avenue <br />Sunny Isles Beach, Florida 33160 <br />(305) 947-0606 City Hall <br />(305) 949-3113 Fax <br />MEMORANDUM <br />Honorable Mayor and City Commissioners <br />Christopher J. Russo, City Manager <br />Susan Simpson, Assistant City Manager <br />June 17, 2021 <br />Approval of a Special Service Agreement with AT&T for Utility <br />Undergrounding <br />RECOMMENDATION: <br />Staff recommends approval of this Resolution. <br />REASONS: <br />AT&T has submitted a proposed fee for facilitating the underground conversion of the existing <br />overhead utility line for 175 Terrace to 183rd Street, more commonly referred to as Phase 3 of the <br />Collins Undergrounding Project. <br />Engineering design was provided by AT&T and included in the construction activities being completed <br />by City contractors. However, the actual cost for AT&T to install underground conductors in City <br />installed conduit and remove existing overhead facilities was never finalized. <br />The approval of this expenditure in the amount of $62,000.00 will allow for the ongoing conversion of <br />the conversion project. <br />FUNDING SOURCE: <br />Funds have been appropriated in account no. 300-5-5390-465000-80004. <br />ATTACHMENTS: <br />Resolution <br />Special Construction Agreement <br />Item Number: 10.E <br />
The URL can be used to link to this page
Your browser does not support the video tag.