My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2021-3221
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2021
>
Reso 2021-3221
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/11/2024 11:14:03 PM
Creation date
8/9/2021 12:35:42 PM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2021-3221
Date (mm/dd/yyyy)
07/15/2021
Description
Waive Bid Req. & Approving Agmt w/CT Mechanical for inspection & preventatitve maintenance for AC/HVAC Gateway Park
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Sunny Isles Beach 18070 Collins Avenue, Sunny Isles Beach, Florida 33160 <br />(305) 947-0606 phone (305) 949-3113 Fax <br />Contractor. In the event of failure of Contractor to make all necessary repairs <br />promptly and fully, which is not cured in the cure period, the City may declare <br />Contractor in default. <br />9.3 If, within one (1) year after the date of completion of Services or such longer <br />period of time as may be prescribed by the terms of any applicable special <br />warranty required by the Contract Documents, or by any specific provision(s) of <br />this Agreement, any of the work is found to be defective or not in accordance with <br />this Agreement, Contractor, after receipt of written notice from the City or its <br />designee, shall promptly correct such defective or nonconforming work within the <br />time specified by the City without cost to the City. Nothing contained herein shall <br />be construed to establish a period of limitation with respect to any other <br />obligation which Contractor might have under this Agreement including but not <br />limited to any claim regarding latent defects. <br />9.4 Failure to reject any defective work or material shall not in any way prevent <br />later rejection when such defect is discovered, or obligate the City to final <br />acceptance. <br />9.5 Where the City or its designee becomes aware of faults, defects or non- <br />conformity in any of the work provided under this Agreement or with the work <br />being performed by the Contractor, the City or its designee shall issue a Notice to <br />Cure to the Contractor for correction. In no event shall the failure of the City or its <br />designee to bring to the attention of the Contractor of such faults act as a waiver <br />or release the Contractor from responsibility or liability for such fault, defect or <br />non -conforming work. <br />10. TERMINATION AND REMEDIES FOR BREACH. <br />A. If, through any cause within reasonable control, the Contractor shall fail to fulfill <br />in a timely manner or otherwise violate any of the covenants, agreements or <br />stipulations material to this Agreement, the City shall have the right to terminate <br />the Services then remaining to be performed. Prior to the exercise of its option to <br />terminate for cause, the City shall notify the Contractor of its violation of the <br />particular terms of the Agreement and grant Contractor ten (10) days to cure such <br />default. If the default remains uncured after ten (10) days the City may terminate <br />this Agreement, and the City shall receive a refund from the Contractor in an <br />amount equal to the actual cost of a third party to cure such failure. If Contractor <br />fails, refuses or is unable to perform any term of this Agreement, City shall pay for <br />services rendered as of the date of termination. <br />(i.) In the event of termination, all finished and unfinished documents, data and <br />other work product prepared by Contractor shall be delivered to the City and <br />the City shall compensate the Contractor for all Services satisfactorily <br />performed prior to the date of termination. <br />(ii.) Notwithstanding the foregoing, the Contractor shall not be relieved of liability <br />to the City for damages sustained by it by virtue of a breach of the Agreement <br />2021- 7666 CT Mechanical Co. <br />219 <br />
The URL can be used to link to this page
Your browser does not support the video tag.