Reso 2014-2251
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2014
>
Reso 2014-2251
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/18/2015 3:32:27 PM
Creation date
7/7/2014 3:35:53 PM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2014-2251
Date (mm/dd/yyyy)
06/19/2014
Description
Awd Bid 14-04-01/Agmt w/Lynx Construction: Arlen House Right-of-Way Improvemts
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
---wwwegmessiguik), <br /> CONSTRUCTION <br /> MANAGEMENT <br /> Date: 09/26/2014 <br /> Request For Change Order (RCO1#2 <br /> Project: Sunny Isles Beach —Arlen House # 142911 <br /> Scope: <br /> REMOVAL OF SIGN FOOTING <br /> 1. Provide all labor, materials, and equipment for the removal of an unforeseen existing sign <br /> footing and secondary footing discovered during demolition of the previous wall and <br /> planters. <br /> 2. Unforeseen footing extends 30' long and 6'wide with (6) steel posts. The footing was <br /> approximately 3'deep. <br /> 3. Remove an additional 30'x 1.5'x 2'footing from a previous wall that was buried and not <br /> connected to previously demolished wall This footing was buried and not indicated on <br /> the plans as an existing condition. <br /> 4. Provide chipping hammer attachment for bobcat rental for one week. Provide skilled <br /> equipment operator. <br /> 5. Remove all debris to dumpster and haul off site. <br /> 6. Provide(1)week of general conditions for work on critical path. <br /> Description Unit Quantity Unit Cost Total <br /> General Conditions WK 1 $1,500.00 $1,500.00 <br /> Demolition Sign Footing LS 1 $2,580.00 $2,580.00 <br /> Demolition 2nd Footing LS 1 $1,480.00 $1,480.00 <br /> Disposal&Waste EA 1 $500.00 $500.00 <br /> Subtotal $6,060.00 <br /> 15%OH&P $909.00 <br /> 1.2%Liability Insurance $0.00 <br /> 1.0%Bond $0.00 <br /> Total Change Order $6,969.00 <br /> GC reserves the right to request an equitable time extension for rescheduling delays, disruption, <br /> acceleration and/or impact in the event this modification changes the construction sequence <br /> and/or time of completion. <br /> The total amount of this change order request is: $6,969.00 <br /> Acceptance to this proposal will enable Contractor to incorporate into prime contract. <br /> SUBMITTED BY: APPROVED BY: <br /> Brian Shirley <br /> Lynx Construction Management, LLC. Date Accepted to Proceed <br />