My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2014-2251
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2014
>
Reso 2014-2251
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/18/2015 3:32:27 PM
Creation date
7/7/2014 3:35:53 PM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2014-2251
Date (mm/dd/yyyy)
06/19/2014
Description
Awd Bid 14-04-01/Agmt w/Lynx Construction: Arlen House Right-of-Way Improvemts
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
t <br /> :" I " <br /> I. IV X <br /> CONSTRUCTION <br /> MANAGEMENT <br /> Date: 12/15/2014 <br /> Request For Change Order (RCO) #7 <br /> Project: Sunny Isles Beach —Arlen House # 142911 <br /> Scope: <br /> Public Works Loop <br /> 1. Provide and install two(2) new signal loop assemblies for Bay View and Collins Ave. <br /> 2. Provide new homeruns and signal controller. <br /> 3. Work shall be performed by Miami Dade County Public Works registered and licensed <br /> electrician. <br /> 4. Permit fees are not included and will be determined after issuance <br /> Description Unit Quantity Unit Cost Total <br /> Electrical EA 2 $2,400.00 $4,800.00 <br /> Subtotal $4,800.00 <br /> 15%OH&P $720.00 <br /> 1.2%Liability Insurance $0.00 <br /> 1.0%Bond $0.00 <br /> Total Change Order $5,520.00 <br /> GC reserves the right to request an equitable time extension for rescheduling delays, disruption, <br /> acceleration and/or impact in the event this modification changes the construction sequence <br /> and/or time of completion. <br /> The total amount of this change order request is: $5,520.00 <br /> Acceptance to this proposal will enable Contractor to incorporate into prime contract. <br /> SUBMITTED BY: APPROVED BY: <br /> Brian Shirley <br /> Lynx Construction Management, LLC. Date Accepted to Proceed <br />
The URL can be used to link to this page
Your browser does not support the video tag.