Laserfiche WebLink
Eta F=� F77) ~T BEAB. <br />Intel "tek tn�t"ttpk Intertek In\te F ttPk Intertek In ter fPk, Intertek <br />Proposal Number 500526566 <br />Reference: PVC Clad Railing System <br />Prepared for: Helen Gray <br />City of Sunny Isles Beach <br />18070 Collins Avenue <br />Sunny Isles Beach, FL 33160 <br />Date: 04/30/2014 <br />Prepared by: Anne Whitson <br />Account Manager <br />Intertek Testing Services NA, Inc. <br />Phone: (305) 792 -1913 Phone 608 -824 -7415 <br />Fax: Fax: <br />E -mail: hgray @sibfl.net E -mail: anne.whitson @intertek.com <br />Inter tvkGS <br />Intertek provides the building products and materials industry with a variety of testing, certification, and <br />engineering evaluation services. As a full - service testing partner, Intertek offers product conformity and <br />performance testing as well as structural, physical, and mechanical evaluations and flammability, flame <br />spread, fire resistance, and environmental testing. For over a century, Intertek has been the accepted <br />symbol of compliance for thousands of manufacturers across a wide range of product categories.This <br />proposal itemizes the services applicable for your noted product. <br />Gathering of information and initial project planning: <br />All of the relevant information about your product must be gathered and sent to your Project Manager so <br />they may prepare an initial project plan. The information required may be contained in installation <br />instructions, drawings, specifications, copies of labels, brochures, or other documents. Assemble all <br />information that you feel is relevant and send this package of information to your Project Manager. Your <br />Project Manager will review the information, prepare an initial project plan (also known as Contract <br />Review), review the plan with you, or advise you if there is additional information required to get the <br />project started. If it is determined during the Contract Review that the scope of work required exceeds <br />what was originally quoted, your Account Manager will issue a Project Change Order Request (PCOR) <br />that will capture the additional work to be performed. Conversely, if a reduction in scope is warranted a <br />PCOR will be issued as well. The conclusion of this phase results in a completed Contract Review form. <br />Testing and /or Evaluation: <br />The physical tests and /or evaluations required will be carried out in accordance with the previously <br />determined test plan and according to the conditions below: <br />• Should a product fail, if the failure has no influence on the outcome of other portions of the test plan <br />then testing may proceed through completion of the remaining test plan. <br />• The criteria listed below may not represent all standards or criteria applicable to your particular <br />material or component. Evaluations to additional standards or criteria are not included and may be <br />quoted separately upon request. <br />• At the end of testing, our engineer will provide you with a written statement of compliance or a <br />Intertek Testing Services NA, Inc. Q500526566 <br />Page 2 of 8 <br />