My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ITB 21-08-01 Utility Undergrounding Golden Shores (final)
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(21-08-01) Utility Undergrounding Conversion for Golden Shores
>
ITB 21-08-01 Utility Undergrounding Golden Shores (final)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/1/2021 10:14:46 AM
Creation date
9/1/2021 10:11:02 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Utility Undergrounding Conversion for Golden Shores
Bid No. (xx-xx-xx)
21-08-01
Project Type (Bid, RFP, RFQ)
Bid
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
287
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />00700 - 18/38 <br />Supplementary General Conditions, neither the OWNER nor the ENGINEER <br />shall have any authority or responsibility in respect of such coordination. <br /> <br /> <br />ARTICLE 8 -- OWNER'S RESPONSIBILITIES <br /> <br />8.1 COMMUNICATIONS <br /> <br />A. The OWNER shall issue all its communications to the CONTRACTOR through <br />the ENGINEER. <br /> <br />8.2 PAYMENTS <br /> <br />A. The OWNER shall make payments to the CONTRACTOR as provided in <br />Paragraphs 14.5 and 14.8. <br /> <br />8.3 LANDS, EASEMENTS, AND SURVEYS <br /> <br />A. The OWNER's duties in respect of providing lands and easements and providing <br />engineering surveys to establish reference points are set forth in Paragraphs 4.1 <br />and 4.5. The OWNER shall identify and make available to the CONTRACTOR <br />copies of reports of explorations and tests of subsurface conditions at the site <br />and in existing structures which have been utilized by the ENGINEER in <br />preparing the Drawings and Technical Specifications as set forth in Paragraph <br />4.2. <br /> <br />8.4 CHANGE ORDERS <br /> <br />A. The OWNER shall execute Change Orders as indicated in Paragraph 10.1D. <br /> <br /> <br />8.5 INSPECTIONS AND TESTS <br /> <br />A. The OWNER's responsibility in respect of certain inspections, tests, and <br />approvals is set forth in Paragraph 13.3B. <br /> <br />8.6 SUSPENSION OF WORK <br /> <br />A. In connection with the OWNER's right to stop Work or suspend Work, see <br />Paragraphs 13.4 and 15.1. Paragraphs 15.2 and 15.3 deal with the OWNER's <br />right to terminate services of the CONTRACTOR under certain circumstances. <br /> <br /> <br />ARTICLE 9 -- ENGINEER'S STATUS DURING CONSTRUCTION <br /> <br />9.1 OWNER'S REPRESENTATIVE <br /> <br />A. The duties and responsibilities and the limitations of authority of the OWNER's <br />representative during construction are set forth in the Contract Documents. <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.