Laserfiche WebLink
I. MATERIALS <br />147 <br />596 <br />it <br />Coconut Palm OTC Injection <br />Application <br />.$ 5.00 <br />$ 2,980.00 <br />148 <br />39S <br />12 <br />Date Palm OTC Injection <br />AwIcation <br />$ 5.00 <br />$1,975.00 <br />149 <br />I3 <br />Topsoil (70/30 Mix) <br />200 <br />$45.00 <br />8;000.00 <br />Del- and Installed <br />Cu. Yd. <br />1S0 <br />I4 <br />Premium Gold Mulch <br />Delivered and Installed <br />1,500 <br />Cu. Yd. <br />$32.00 <br />$ 48,000.00 <br />15115 <br />Premium Gold Mulch <br />Sags <br />$ 3.25 <br />325.00 . <br />$ <br />Delivered and Installed :: <br />2 <br />152 <br />16 <br />#70 Trap Sand <br />Delivered and Installed <br />700 <br />Cu. Yd. <br />$ 30.00 <br />$ 21,000.00 <br />153 <br />17 <br />Atlas 3000 (or equal) Mix <br />Delivered and Installed <br />100 <br />Cu. Yd. <br />$ 52.00 <br />$ 5,200.00 <br />1S4 <br />I8 <br />Solid St. Augustlne'Floratam' Sod <br />2500 <br />$ 0.70 <br />$ 1,750.00 <br />De livered and Installed <br />Sq. R. <br />15S <br />1 <br />I9 <br />Solid St. Augustine'Floratam' Sod <br />60 pallets <br />(500 SF <br />$ 350.00 <br />$ 21,000.00 <br />Delivered and Installed <br />Each <br />156 <br />I30 <br />Solid Bennuda'Tifway 419' Turf <br />5 pallets <br />(400 S <br />$ 400.00 <br />$ 2,000.00 <br />Delivered and Installed <br />Each <br />157 <br />CI1 <br />Solid Paspalum notatum'Argentine' Bahia Sod <br />pal <br />SF <br />550.00 <br />$ <br />$ 2,750.00 <br />Delivered and Installed <br />Each <br />158 <br />' <br />.. <br />112 <br />Palm Beach Cap Rods <br />4 Sq. Ft. <br />$ 40.00 <br />$ 160.00 <br />Subtotal Section "I" Lines No. 147.-- 158- <br />$116,140.00' <br />3. LABOR <br />159• 100 Hours <br />ll One landscape Superintendent (8am — <br />Spm, M -F) $ 30.00 $ 3,000.00 <br />City of Sunny Isles Beach I ITB 18.03-03 Right -of -Ways and Facilities landscape Maintenance Services <br />Lukes' Landscaping, Inc. <br />