My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
LPA 2021-108
SIBFL
>
City Clerk
>
Resolutions
>
Local Planning Agency
>
2021
>
LPA 2021-108
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/30/2022 9:24:20 AM
Creation date
9/22/2021 4:28:49 PM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Local Planning Agency Resolution
Resolution Number
2021-108
Date (mm/dd/yyyy)
02/18/2021
Description
Recommending to adopt the Comprehensive Plan to provide for a Ten-Year water supply facilities work plan
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• Adding new vessels to the existing RO skids (2.0 mgd). <br />• Creating another 0.5 mgd in blended raw water. <br />This approach has since been altered due to the Biscayne Aquifer restrictions imposed by <br />the SFWMD under their Water Availability Rule. <br />New Floridan Well <br />A new well, Florida Well F-5, is proposed and to be funded through Impact Fees during <br />the 2021-2023 planning period. <br />5.2 Capital Improvements Schedule <br />T-;;-hlp- -3 (Table 6 3 A -f the NN.46- Plan Update) en the next page details the peFtahle water <br />5.3 Funding <br />The costs of operating, maintaining, and improving the water system are offset by water and <br />sewers fees. The volume of water sold to customers is measured by water meters that are <br />installed at each customer's address. The System is an enterprise fund of the City of North Miami <br />Beach, separate from all other funds of the City of North Miami Beach. <br />The rates that are charged to customers are reviewed annually and adjusted as needed in order <br />to provide sufficient revenues to offset the administrative, operation and maintenance, debt <br />service and other expenses set forth in the NMB Water's annual budget. <br />The following lists the Goals, Objectives and Policies included in the City's adopted <br />Comprehensive Plan to ensure consistency between the elements in the Plan and the =1 E 2020 <br />10 -Year Water Supply Facilities Work Plan Update. <br />Infrastructure Element <br />Policy 2A: To assure an adequate level of service, potable water and sanitary sewer shall <br />meet the following level of service standards: <br />1) Potable Water SuDDIV: <br />a) The regional treatment system shall operate with a rate maximum daily <br />capacity that at a minimum is X44121 gpcpd based on average annual <br />flow. <br />b) Water shall be delivered to users at a pressure no less than 20 pounds <br />per square inch (psi) and no greater than 100 psi. Unless otherwise <br />23 <br />
The URL can be used to link to this page
Your browser does not support the video tag.